Sparely
DU

SCREW,TAPPING,M4X16MM,SS304

Material 4100098724 · SCREW · Plant 1000

AMonitorCritical insurance spare
Material
4100098724
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
20 d · P80 33 d
Unit price
Rp 1,538 (est.)

Recommendation

  • 1.Forecast 174 EA/year: 174 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~20 days; expected demand during lead time 9.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 234, order up to 409.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 1 other material number
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
234
safety stock 225
Rec. Max
409
order qty 175
Service level
100.0%
stockout risk now 8%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 17 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 320.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 2 functional locations

1 with criticality A/B · 5,437 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A5,0377327.01
PX_BF-108
CRACKING FURNACE BF-108
S400239.44

Lead time and procurement

Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112

Recent goods issues

Never issued in the 17-month history.