SCREW,TAPPING,M3X16MM,SS304

Material 4100098910 · SCREW · Plant 1000

ATransferCriticalStockout
Material
4100098910
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
20 d · P80 33 d
Unit price
Rp 1,538 (est.)

Recommendation

  • 1.Forecast 193 EA/year: 193 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 11.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 150, order up to 343.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 343 needed.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100098169 holds spare stock: transfer 343 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
150
safety stock 140
Rec. Max
343
order qty 193
Service level
100.0%
stockout risk now 19%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 827.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 1 functional locations

1 with criticality A/B · 50 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A502911.58

Lead time and procurement

Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
09 Jul 2026MediumPX_BF-109Thermograph wall BF-109
09 Jul 2026LowPX_BF-109Leak from packing
01 Jul 2026EmergencyPX_BF-109[MSI-B-26-YDN-280/M] Replace line
23 Jun 2026HighPX_BF-109Cleaning burner BF-109

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202650201000019926Corrective