Sparely
DU

SCREW,TAPPING,M3X20MM,CS ZN

Material 4100099217 · SCREW · Plant 1000

AMonitorCritical insurance spare
Material
4100099217
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
35 d · P80 75 d
Unit price
Rp 2,194

Recommendation

  • 1.Forecast 43 EA/year: 43 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~35 days; expected demand during lead time 4.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 117, order up to 234.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidateSingle sourceSame description as 1 other material number
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
117
safety stock 113
Rec. Max
234
order qty 117
Service level
99.9%
stockout risk now 3%
Unit price
Rp 2,194
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 79.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 1 functional locations

1 with criticality A/B · 5,037 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-107
CRACKING FURNACE BF-107
A5,037239.01

Lead time and procurement

Lead time 35 ± 32 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
28 Aug 2026PR06
Regular replenishment
2Rp 2,19416 Sept 202619 d
17 Mar 2026PR06
Regular replenishment
1Rp 2,12207 Apr 202621 d
06 Feb 2026PR01
Import / long-lead
1Rp 2,26728 May 2026111 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
15 Aug 2026MediumPX_BF-107Hot spot at convection BF-107
08 Aug 2026LowPX_BF-107Cleaning burner BF-107
21 Jul 2026MediumPX_BF-107Replace lamp as per PM finding
21 Jul 2026MediumPX_BF-107Thermograph wall BF-107
18 Jul 2026EmergencyPX_BF-107Hot spot at convection BF-107
10 Jul 2026MediumPX_BF-107Hot spot at convection BF-107
12 Apr 2026MediumPX_BF-107Decoking follow up BF-107
07 Mar 2026MediumPX_BF-107Thermograph wall BF-107

Recent goods issues

Never issued in the 17-month history.

Sparely