Sparely
DU

SCREW,TAPPING,M3X16MM,SS304

Material 4100099548 · SCREW · Plant 1000

SMonitorPotentially obsolete
Material
4100099548
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
20 d · P80 33 d
Unit price
Rp 1,538 (est.)

Recommendation

  • 1.Forecast 45 EA/year: 45 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~20 days; expected demand during lead time 2.5.
  • 3.A 97.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 117.
Price estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
117
order qty 117
Service level
97.9%
stockout risk now 2%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 682,432/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~10 days.

Installed on 1 functional locations

0 with criticality A/B · 5,037 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-108
CRACKING FURNACE BF-108
S5,037239.44

Lead time and procurement

Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Never issued in the 17-month history.