Sparely
DU

BOLT,ANCHOR,MODEL FY385,VITON

Material 4100099743 · BOLT · Plant 1000

AReorderCriticalBelow reorder point
Material
4100099743
Category
BOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (9 of 15 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
32 d · P80 53 d
Unit price
Rp 46,268

Recommendation

  • 1.Forecast 70 EA/year: 70 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~32 days; expected demand during lead time 6.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 22, order up to 92.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 91 now.
  • 5.Installed on 15 FuncLoc(s), 9 of them criticality A/B.
Proposed purchase requisition
91 EA
Rp 4.2M · order by 01 Oct 2026
Expected arrival ≈ 32 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
22
safety stock 16
Rec. Max
92
order qty 70
Service level
99.9%
stockout risk now 86%
Unit price
Rp 46,268
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 124 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 15 functional locations

9 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A211442.86
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_BF-103
CRACKING FURNACE BF-103
A43814.58
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_BF-111
CRACKING FURNACE BF-111
A2239.01
PX_PP-1101A-CST
CONCRETE STRUCTURE PP-1101A
C100.19
PX_PP-1881A-CST
CONCRETE STRUCTURE PP-1881A
C100.19
PX_PP-705-CST
CONCRETE STRUCTURE PP-705
C100.19

Lead time and procurement

Lead time 32 ± 19 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
20 Jan 2026PR01
Import / long-lead
1Rp 46,78013 Apr 202683 d
26 Dec 2025PR03
Regular replenishment
1Rp 45,75605 Jan 202610 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107

Recent goods issues

Posting dateQtyOrderOrder type
08 Jul 20262201000003402Corrective
02 Jan 20261201000001266Corrective