BOLT,ANCHOR,MODEL FY385,VITON
Material 4100099743 · BOLT · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100099743
- Category
- BOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (9 of 15 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 32 d · P80 53 d
- Unit price
- Rp 46,268
Recommendation
- 1.Forecast 70 EA/year: 70 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~32 days; expected demand during lead time 6.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 22, order up to 92.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 91 now.
- 5.Installed on 15 FuncLoc(s), 9 of them criticality A/B.
Proposed purchase requisition
91 EA
Rp 4.2M · order by 01 Oct 2026
Expected arrival ≈ 32 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
22
safety stock 16
Rec. Max
92
order qty 70
Service level
99.9%
stockout risk now 86%
Unit price
Rp 46,268
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 124 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 15 functional locations
9 with criticality A/B · 20 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 2 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 1 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 4 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 2 | 23 | 9.01 |
| PX_PP-1101A-CST CONCRETE STRUCTURE PP-1101A | C | 1 | 0 | 0.19 |
| PX_PP-1881A-CST CONCRETE STRUCTURE PP-1881A | C | 1 | 0 | 0.19 |
| PX_PP-705-CST CONCRETE STRUCTURE PP-705 | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 32 ± 19 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Jan 2026 | PR01 Import / long-lead | 1 | Rp 46,780 | 13 Apr 2026 | 83 d |
| 26 Dec 2025 | PR03 Regular replenishment | 1 | Rp 45,756 | 05 Jan 2026 | 10 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jul 2026 | 2 | 201000003402 | Corrective |
| 02 Jan 2026 | 1 | 201000001266 | Corrective |