BOLT,ANCHOR,SIZE PF180,A105

Material 4100099761 · BOLT · Plant 1000

AReorderNormalBelow reorder point
Material
4100099761
Category
BOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
29 d · P80 53 d
Unit price
Rp 10,135

Recommendation

  • 1.Forecast 22 EA/year: 22 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 1.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 30.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 27 now.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
27 EA
Rp 273,645 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
30
order qty 23
Service level
99.9%
stockout risk now 10%
Unit price
Rp 10,135
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 62 days ago, 52 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 7 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-112
CRACKING FURNACE BF-112
A37327.01
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_PP-1049-CST
CONCRETE STRUCTURE PP-1049
C100.19
PX_PP-1101A-CST
CONCRETE STRUCTURE PP-1101A
C100.19
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 29 ± 19 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
22 Mar 2026PR06
Regular replenishment
2Rp 10,13507 May 202646 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105

Recent goods issues

Posting dateQtyOrderOrder type
31 Jul 20261201000005649Corrective
23 Dec 20251201000011788Corrective