BOLT,ANCHOR,SIZE WP610,CS
Material 4100099790 · BOLT · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100099790
- Category
- BOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 23 d · P80 53 d
- Unit price
- Rp 14,210
Recommendation
- 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 0.7.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 15.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 14 now.
- 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
14 EA
Rp 198,940 · order by 01 Oct 2026
Expected arrival ≈ 23 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
15
order qty 11
Service level
99.9%
stockout risk now 15%
Unit price
Rp 14,210
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
2 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 3 | 73 | 27.01 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 3 | 23 | 9.01 |
| PX_PP-1007C-CST CONCRETE STRUCTURE PP-1007C | C | 1 | 0 | 0.19 |
| PX_PP-1049-CST CONCRETE STRUCTURE PP-1049 | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 23 ± 19 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Feb 2026 | PR03 Regular replenishment | 2 | Rp 14,210 | 12 Mar 2026 | 23 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 31 Aug 2026 | Medium | PX_BF-112 | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Jan 2026 | 1 | 201000038273 | Corrective |