Sparely
DU

BOLT,ANCHOR,SIZE WP610,CS

Material 4100099790 · BOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100099790
Category
BOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
23 d · P80 53 d
Unit price
Rp 14,210

Recommendation

  • 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 0.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 15.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 14 now.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
14 EA
Rp 198,940 · order by 01 Oct 2026
Expected arrival ≈ 23 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
15
order qty 11
Service level
99.9%
stockout risk now 15%
Unit price
Rp 14,210
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 4 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A37327.01
PX_BF-111
CRACKING FURNACE BF-111
A3239.01
PX_PP-1007C-CST
CONCRETE STRUCTURE PP-1007C
C100.19
PX_PP-1049-CST
CONCRETE STRUCTURE PP-1049
C100.19

Lead time and procurement

Lead time 23 ± 19 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
17 Feb 2026PR03
Regular replenishment
2Rp 14,21012 Mar 202623 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
31 Aug 2026MediumPX_BF-112Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
29 Jan 20261201000038273Corrective