Sparely
DU

BOLT,ANCHOR,MODEL SF916,GRAPHITE

Material 4100099802 · BOLT · Plant 1000

AMonitorCritical insurance spare
Material
4100099802
Category
BOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 53 d
Unit price
Rp 20,009 (est.)

Recommendation

  • 1.Forecast 2.0 EA/year: 2.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 20,009
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 31 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 391.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_PP-1101A-CST
CONCRETE STRUCTURE PP-1101A
C100.19
PX_PP-416A-CST
CONCRETE STRUCTURE PP-416A
C100.19

Lead time and procurement

Lead time 23 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106

Recent goods issues

Never issued in the 17-month history.

Sparely