Sparely
DU

BOLT,ANCHOR,SIZE DI776,SS316

Material 4100099839 · BOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100099839
Category
BOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 53 d
Unit price
Rp 20,009 (est.)

Recommendation

  • 1.Forecast 29 EA/year: 29 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 1.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 37.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 35 now.
  • 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
35 EA
Rp 700,315 · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
37
order qty 30
Service level
99.9%
stockout risk now 28%
Unit price
Rp 20,009
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 346 days ago, 54 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

5 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A411442.86
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_BF-111
CRACKING FURNACE BF-111
A1239.01

Lead time and procurement

Lead time 23 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105

Recent goods issues

Posting dateQtyOrderOrder type
20 Oct 20251201000029789Corrective