BOLT,ANCHOR,TYPE CE837,CS

Material 4100099995 · BOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100099995
Category
BOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 53 d
Unit price
Rp 20,009 (est.)

Recommendation

  • 1.Forecast 9.3 EA/year: 9.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 0.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 15.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 11 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 220,099 · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
15
order qty 10
Service level
99.9%
stockout risk now 1%
Unit price
Rp 20,009
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_PP-584A-CST
CONCRETE STRUCTURE PP-584A
C100.19

Lead time and procurement

Lead time 23 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104

Recent goods issues

Posting dateQtyOrderOrder type
14 Jan 20262201000004308Corrective
29 Oct 20251201000001795Corrective