ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-A
Material 4100101606 · ANTIRUST · Plant 1000
AMonitorHealthy
- Material
- 4100101606
- Category
- ANTIRUST
- Base unit
- CAN
- MRP type
- Stock Item
- Criticality
- A (1 of 6 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 18 d · P80 23 d
- Unit price
- Rp 78,200
Recommendation
- 1.Forecast 492 CAN/year: 492 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~18 days; expected demand during lead time 24.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 99, order up to 407.
- 4.Installed on 6 FuncLoc(s), 1 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 100Single sourceAbnormal consumptionSame description as 6 other material numbers
On hand / on order
381 / 0
no open PO
Today Min / Max
111 / 173
static parameters in BoM
Rec. Min (reorder point)
99
safety stock 76
Rec. Max
407
order qty 308
Service level
99.9%
stockout risk now 0%
Unit price
Rp 78,200
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 37 issue days in the last 180 days, last issue 7 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 13 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (142 units) excluded from the baseline.
Demand pattern Smooth · 154 issue days · 9 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 18.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 6 functional locations
1 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_2-CW-24122-A22A-HS PIPE-2 FROM HE-848C TO PP-942D | A | 1 | 0 | 0.01 |
| PX_1-HS-24003-A41A-HS PIPE-1 FROM VD-1417C TO VD-269 | C | 1 | 2 | 0.44 |
| PX_1-IA-9237-B22A-C PIPE-1 FROM HE-308C TO HE-593C | C | 1 | 1 | 0.01 |
| PX_1-MS-17028-A41A-H PIPE-1 FROM HE-113B TO HE-730 | C | 1 | 0 | 0.01 |
| PX_3/4-CW-27542-A11A-T PIPE-3/4 FROM KC-147D TO HE-755D | C | 1 | 0 | 0.01 |
| PX_3/4-QO-18581-A11A-T PIPE-3/4 FROM HE-1808D TO PP-1477B | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 18 ± 15 days (PO history, 39 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Sept 2026 | PR03 Regular replenishment | 146 | Rp 78,780 | 26 Sept 2026 | 12 d |
| 30 Aug 2026 | PR06 Regular replenishment | 383 | Rp 77,856 | 13 Sept 2026 | 14 d |
| 30 Jul 2026 | PR06 Regular replenishment | 457 | Rp 80,175 | 13 Aug 2026 | 14 d |
| 22 Jul 2026 | PR03 Regular replenishment | 331 | Rp 76,677 | 01 Aug 2026 | 10 d |
| 25 Jun 2026 | PR06 Regular replenishment | 405 | Rp 77,366 | 03 Jul 2026 | 8 d |
| 23 Jun 2026 | PR06 Regular replenishment | 411 | Rp 76,922 | 25 Jul 2026 | 32 d |
| 08 Jun 2026 | PR03 Regular replenishment | 381 | Rp 77,795 | 18 Jun 2026 | 10 d |
| 27 May 2026 | PR03 Regular replenishment | 330 | Rp 80,491 | 05 Jun 2026 | 9 d |
| 26 May 2026 | PR01 Import / long-lead | 215 | Rp 79,032 | 29 Jun 2026 | 34 d |
| 08 May 2026 | PR03 Regular replenishment | 263 | Rp 78,451 | 17 May 2026 | 9 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Jun 2026 | Medium | PX_1-HS-24003-A41A-HS | Thickness measurement 1-HS-24003-A41A-HS |
| 30 May 2025 | Medium | PX_1-HS-24003-A41A-HS | Replace pipe 1-HS-24003-A41A-HS |
| 20 May 2025 | Medium | PX_1-IA-9237-B22A-C | Clean dummy leg 1-IA-9237-B22A-C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Sept 2026 | 6 | 209000029477 | Other maintenance |
| 14 Sept 2026 | 7 | 201000037959 | Corrective |
| 11 Sept 2026 | 5 | 204000027084 | Preventive |
| 02 Sept 2026 | 4 | 205000021758 | Other maintenance |
| 25 Aug 2026 | 1 | 201000018294 | Corrective |
| 21 Aug 2026 | 4 | 201000025413 | Corrective |
| 15 Aug 2026 | 3 | 201000033173 | Corrective |
| 13 Aug 2026 | 5 | 201000018816 | Corrective |
| 11 Aug 2026 | 1 | 201000022527 | Corrective |
| 02 Aug 2026 | 2 | 201000031855 | Corrective |
| 25 Jul 2026 | 1 | 201000025485 | Corrective |
| 22 Jul 2026 | 5 | 201000021281 | Corrective |
| 07 Jul 2026 | 1 | 201000003402 | Corrective |
| 06 Jul 2026 | 1 | 201000003794 | Corrective |
| 06 Jul 2026 | 6 | 204000019293 | Preventive |