ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-B
Material 4100101692 · ANTIRUST · Plant 1000
CMonitorHealthy
- Material
- 4100101692
- Category
- ANTIRUST
- Base unit
- CAN
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- BERKAH ENERGI MAKMUR PT
- Lead time
- 17 d · P80 23 d
- Unit price
- Rp 55,910
Recommendation
- 1.Forecast 95 CAN/year: 95 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~17 days; expected demand during lead time 4.4.
- 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 110.
- 4.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 10Single sourceAbnormal consumptionSame description as 5 other material numbers
On hand / on order
35 / 0
no open PO
Today Min / Max
11 / 31
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 11
Rec. Max
110
order qty 95
Service level
99.2%
stockout risk now 0%
Unit price
Rp 55,910
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 10 issue days in the last 180 days, last issue 11 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (16 units) excluded from the baseline.
Demand pattern Smooth · 40 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 131.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_3/4-CW-2361-B23A-H PIPE-3/4 FROM PP-1393B TO VD-884 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 17 ± 6 days (PO history, 14 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Aug 2026 | PR03 Regular replenishment | 49 | Rp 55,501 | 13 Sept 2026 | 24 d |
| 13 Aug 2026 | PR03 Regular replenishment | 55 | Rp 57,749 | 29 Aug 2026 | 16 d |
| 08 Apr 2026 | PR06 Regular replenishment | 68 | Rp 55,587 | 04 May 2026 | 26 d |
| 28 Nov 2025 | PR03 Regular replenishment | 39 | Rp 54,201 | 20 Dec 2025 | 22 d |
| 26 Nov 2025 | PR06 Regular replenishment | 49 | Rp 54,847 | 06 Dec 2025 | 10 d |
| 24 Nov 2025 | PR03 Regular replenishment | 50 | Rp 57,990 | 07 Dec 2025 | 13 d |
| 15 Nov 2025 | PR03 Regular replenishment | 34 | Rp 53,434 | 08 Dec 2025 | 23 d |
| 28 Sept 2025 | PR03 Regular replenishment | 83 | Rp 57,801 | 10 Oct 2025 | 12 d |
| 22 Sept 2025 | PR03 Regular replenishment | 41 | Rp 55,978 | 08 Oct 2025 | 16 d |
| 11 Aug 2025 | PR03 Regular replenishment | 78 | Rp 57,672 | 06 Sept 2025 | 26 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2026 | 2 | 201000006305 | Corrective |
| 13 Aug 2026 | 3 | 201000031702 | Corrective |
| 02 Aug 2026 | 1 | 201000026506 | Corrective |
| 02 Aug 2026 | 2 | 201000026506 | Corrective |
| 01 Aug 2026 | 2 | 201000026506 | Corrective |
| 10 Jul 2026 | 8 | 201000014221 | Corrective |
| 08 Jul 2026 | 2 | 201000018600 | Corrective |
| 17 Jun 2026 | 1 | 201000006833 | Corrective |
| 29 May 2026 | 1 | 201000027832 | Corrective |
| 22 May 2026 | 2 | 201000022307 | Corrective |
| 08 May 2026 | 4 | 201000013238 | Corrective |
| 08 May 2026 | 9 | 204000032966 | Preventive |
| 21 Mar 2026 | 3 | 201000019771 | Corrective |
| 03 Mar 2026 | 8 | 201000011654 | Corrective |
| 26 Feb 2026 | 8 | 204000035815 | Preventive |