ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B
Material 4100101705 · ANTIRUST · Plant 1000
CMonitorHealthy
- Material
- 4100101705
- Category
- ANTIRUST
- Base unit
- CAN
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- MEGA TEKNOLOGI SENTOSA PT
- Lead time
- 23 d · P80 35 d
- Unit price
- Rp 72,991
Recommendation
- 1.Forecast 96 CAN/year: 96 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~23 days; expected demand during lead time 6.0.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 115.
- 4.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 14Single sourceSame description as 6 other material numbers
On hand / on order
51 / 0
no open PO
Today Min / Max
29 / 73
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 13
Rec. Max
115
order qty 97
Service level
99.3%
stockout risk now 0%
Unit price
Rp 72,991
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 14 issue days in the last 180 days, last issue 3 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (14 units) excluded from the baseline.
Demand pattern Smooth · 37 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 136.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_3/4-FG-27730-A51A-HS PIPE-3/4 FROM PP-958B TO PP-1393B | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 23 ± 11 days (PO history, 12 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Apr 2026 | PR03 Regular replenishment | 47 | Rp 73,390 | 22 Apr 2026 | 12 d |
| 08 Apr 2026 | PR03 Regular replenishment | 52 | Rp 72,447 | 02 May 2026 | 24 d |
| 15 Mar 2026 | PR03 Regular replenishment | 50 | Rp 71,379 | 19 Apr 2026 | 35 d |
| 11 Mar 2026 | PR05 Project / turnaround | 49 | Rp 75,454 | 03 Apr 2026 | 23 d |
| 22 Feb 2026 | PR06 Regular replenishment | 51 | Rp 71,812 | 12 Mar 2026 | 18 d |
| 24 Sept 2025 | PR01 Import / long-lead | 47 | Rp 75,425 | 13 Nov 2025 | 50 d |
| 11 Sept 2025 | PR03 Regular replenishment | 64 | Rp 76,624 | 25 Sept 2025 | 14 d |
| 08 Sept 2025 | PR03 Regular replenishment | 25 | Rp 72,755 | 25 Sept 2025 | 17 d |
| 30 Aug 2025 | PR06 Regular replenishment | 53 | Rp 72,735 | 12 Sept 2025 | 13 d |
| 31 Jul 2025 | PR03 Regular replenishment | 19 | Rp 76,620 | 11 Sept 2025 | 42 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Sept 2026 | 2 | 201000031537 | Corrective |
| 24 Sept 2026 | 2 | 204000020188 | Preventive |
| 11 Sept 2026 | 2 | 201000027353 | Corrective |
| 05 Sept 2026 | 1 | 201000030840 | Corrective |
| 02 Sept 2026 | 4 | 204000004134 | Preventive |
| 25 Aug 2026 | 8 | 201000024850 | Corrective |
| 11 Aug 2026 | 1 | 201000013923 | Corrective |
| 05 Aug 2026 | 1 | 201000010969 | Corrective |
| 29 Jul 2026 | 3 | 201000004503 | Corrective |
| 11 Jul 2026 | 5 | 201000020631 | Corrective |
| 29 Jun 2026 | 5 | 201000006253 | Corrective |
| 20 Jun 2026 | 2 | 201000007089 | Corrective |
| 10 Jun 2026 | 5 | 201000028417 | Corrective |
| 04 Apr 2026 | 1 | 201000010228 | Corrective |
| 31 Jan 2026 | 4 | 204000006006 | Preventive |