Sparely
DU

ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-A

Material 4100101768 · ANTIRUST · Plant 1000

AMonitorHealthy
Material
4100101768
Category
ANTIRUST
Base unit
CAN
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA PERSADA PT
Lead time
13 d · P80 16 d
Unit price
Rp 78,089

Recommendation

  • 1.Forecast 64 CAN/year: 64 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~13 days; expected demand during lead time 2.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 82.
  • 4.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 97% probability of demand in the next 90 days.
ML early warningLast turnaround used 38Single sourceAbnormal consumptionSame description as 6 other material numbers
On hand / on order
26 / 0
no open PO
Today Min / Max
23 / 67
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 15
Rec. Max
82
order qty 65
Service level
100.0%
stockout risk now 0%
Unit price
Rp 78,089
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 46 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (38 units) excluded from the baseline.

Demand pattern Erratic · 26 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-DS-20719-A21A-T
PIPE-3/4 FROM VD-123A TO HE-1483A
A110.01
PX_3/4-CW-6117-C11A-T
PIPE-3/4 FROM HE-1750C TO PP-1682
C100.01

Lead time and procurement

Lead time 13 ± 5 days (PO history, 11 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
09 Aug 2026PR06
Regular replenishment
53Rp 81,08730 Aug 202621 d
03 Aug 2026PR03
Regular replenishment
63Rp 78,08914 Aug 202611 d
21 Jun 2026PR06
Regular replenishment
51Rp 77,98304 Jul 202613 d
05 Mar 2026PR06
Regular replenishment
43Rp 79,34218 Mar 202613 d
22 Feb 2026PR06
Regular replenishment
50Rp 75,60503 Mar 20269 d
12 Dec 2025PR06
Regular replenishment
42Rp 77,33028 Dec 202516 d
14 Nov 2025PR03
Regular replenishment
65Rp 79,30322 Nov 20258 d
06 Nov 2025PR03
Regular replenishment
59Rp 78,37517 Nov 202511 d
04 Oct 2025PR04
Regular (other)
60Rp 80,64913 Oct 20259 d
20 Sept 2025PR05
Project / turnaround
49Rp 75,15611 Oct 202521 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 May 2025MediumPX_3/4-DS-20719-A21A-TLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
16 Aug 20263204000039855Preventive
27 Jul 20266201000002237Corrective
20 Jul 20262201000007092Corrective
11 Jul 202611201000020631Corrective
11 Jun 20263201000016926Corrective
19 Apr 20264209000024091Other maintenance
26 Mar 20266201000001401Corrective
22 Mar 20261201000019771Corrective
24 Feb 20262201000013815Corrective
22 Feb 20264201000033036Corrective
22 Jan 20262201000028010Corrective
31 Dec 20254203000036002Turnaround
27 Dec 20251201000026972Corrective
25 Dec 20253201000030056Corrective
23 Dec 202510203000022966Turnaround
Sparely