ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B
Material 4100101773 · ANTIRUST · Plant 1000
CTransferHighStockout
- Material
- 4100101773
- Category
- ANTIRUST
- Base unit
- CAN
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- NUSA ELEKTRIK SENTOSA PT
- Lead time
- 18 d · P80 19 d
- Unit price
- Rp 70,030
Recommendation
- 1.Forecast 40 CAN/year: 40 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~18 days; expected demand during lead time 1.9.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 48.
- 4.On hand 0 + on order 0 is at or below the reorder point: 48 needed.
- 5.ML early warning: 98% probability of demand in the next 90 days.
- 6.Identical part 4100101905, 4100101705, 4100102446 holds spare stock: transfer 48 CAN instead of buying — no purchase needed.
ML early warningLast turnaround used 20Single sourceSame description as 6 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
5 / 9
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
48
order qty 40
Service level
99.3%
stockout risk now 52%
Unit price
Rp 70,030
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 11 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (32 units) excluded from the baseline.
Demand pattern Smooth · 23 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 76.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-1/2-FG-25442-B21A-HS PIPE-1-1/2 FROM KC-264A TO PP-866A | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 18 ± 11 days (PO history, 8 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Aug 2026 | PR03 Regular replenishment | 21 | Rp 71,601 | 22 Aug 2026 | 14 d |
| 12 Jun 2026 | PR03 Regular replenishment | 28 | Rp 68,183 | 29 Jun 2026 | 17 d |
| 12 May 2026 | PR03 Regular replenishment | 21 | Rp 69,672 | 29 Jun 2026 | 48 d |
| 25 Sept 2025 | PR06 Regular replenishment | 27 | Rp 68,834 | 10 Oct 2025 | 15 d |
| 15 Sept 2025 | PR06 Regular replenishment | 34 | Rp 73,275 | 29 Sept 2025 | 14 d |
| 27 Aug 2025 | PR03 Regular replenishment | 26 | Rp 70,387 | 14 Sept 2025 | 18 d |
| 09 Jul 2025 | PR03 Regular replenishment | 15 | Rp 72,647 | 28 Jul 2025 | 19 d |
| 28 Jun 2025 | PR03 Regular replenishment | 14 | Rp 67,966 | 04 Jul 2025 | 6 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2026 | 7 | 201000019618 | Corrective |
| 27 Aug 2026 | 2 | 201000029208 | Corrective |
| 11 Aug 2026 | 5 | 201000005848 | Corrective |
| 09 Jul 2026 | 5 | 201000036103 | Corrective |
| 06 Jul 2026 | 1 | 204000019293 | Preventive |
| 26 Jun 2026 | 1 | 201000033706 | Corrective |
| 13 May 2026 | 2 | 201000021171 | Corrective |
| 22 Feb 2026 | 1 | 201000037651 | Corrective |
| 11 Feb 2026 | 5 | 201000015484 | Corrective |
| 13 Jan 2026 | 3 | 201000029024 | Corrective |
| 03 Jan 2026 | 1 | 201000039014 | Corrective |
| 31 Dec 2025 | 4 | 201000007984 | Corrective |
| 27 Dec 2025 | 1 | 201000037985 | Corrective |
| 26 Dec 2025 | 2 | 203000006078 | Turnaround |
| 25 Dec 2025 | 8 | 203000006078 | Turnaround |