Sparely
DU

ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B

Material 4100101773 · ANTIRUST · Plant 1000

CTransferHighStockout
Material
4100101773
Category
ANTIRUST
Base unit
CAN
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
NUSA ELEKTRIK SENTOSA PT
Lead time
18 d · P80 19 d
Unit price
Rp 70,030

Recommendation

  • 1.Forecast 40 CAN/year: 40 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~18 days; expected demand during lead time 1.9.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 48.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 48 needed.
  • 5.ML early warning: 98% probability of demand in the next 90 days.
  • 6.Identical part 4100101905, 4100101705, 4100102446 holds spare stock: transfer 48 CAN instead of buying — no purchase needed.
ML early warningLast turnaround used 20Single sourceSame description as 6 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
5 / 9
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
48
order qty 40
Service level
99.3%
stockout risk now 52%
Unit price
Rp 70,030
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 11 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (32 units) excluded from the baseline.

Demand pattern Smooth · 23 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 76.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-FG-25442-B21A-HS
PIPE-1-1/2 FROM KC-264A TO PP-866A
C100.01

Lead time and procurement

Lead time 18 ± 11 days (PO history, 8 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
08 Aug 2026PR03
Regular replenishment
21Rp 71,60122 Aug 202614 d
12 Jun 2026PR03
Regular replenishment
28Rp 68,18329 Jun 202617 d
12 May 2026PR03
Regular replenishment
21Rp 69,67229 Jun 202648 d
25 Sept 2025PR06
Regular replenishment
27Rp 68,83410 Oct 202515 d
15 Sept 2025PR06
Regular replenishment
34Rp 73,27529 Sept 202514 d
27 Aug 2025PR03
Regular replenishment
26Rp 70,38714 Sept 202518 d
09 Jul 2025PR03
Regular replenishment
15Rp 72,64728 Jul 202519 d
28 Jun 2025PR03
Regular replenishment
14Rp 67,96604 Jul 20256 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
20 Sept 20267201000019618Corrective
27 Aug 20262201000029208Corrective
11 Aug 20265201000005848Corrective
09 Jul 20265201000036103Corrective
06 Jul 20261204000019293Preventive
26 Jun 20261201000033706Corrective
13 May 20262201000021171Corrective
22 Feb 20261201000037651Corrective
11 Feb 20265201000015484Corrective
13 Jan 20263201000029024Corrective
03 Jan 20261201000039014Corrective
31 Dec 20254201000007984Corrective
27 Dec 20251201000037985Corrective
26 Dec 20252203000006078Turnaround
25 Dec 20258203000006078Turnaround