ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B
Material 4100101905 · ANTIRUST · Plant 1000
CMonitorSlow-moving
- Material
- 4100101905
- Category
- ANTIRUST
- Base unit
- CAN
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- BINTANG MESINDO PRATAMA PT
- Lead time
- 24 d · P80 23 d
- Unit price
- Rp 50,532
Recommendation
- 1.Forecast 1.3 CAN/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~24 days; expected demand during lead time 0.1.
- 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 6.
Single sourceSame description as 6 other material numbers
On hand / on order
6 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
6
order qty 6
Service level
98.6%
stockout risk now 0%
Unit price
Rp 50,532
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 247 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_2-IA-29658-A11A-HS PIPE-2 FROM VD-622 TO HE-410D | C | 1 | 0 | 0.01 |
| PX_3-BF-18205-A21A-HS PIPE-3 FROM HE-149A TO VD-1479 | C | 1 | 0 | 0.01 |
| PX_3-IA-1757-B21A-H PIPE-3 FROM VD-838 TO PP-408B | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 24 ± 7 days (PO history + category, 2 PO lines) · on-time 49%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Aug 2026 | PR03 Regular replenishment | 2 | Rp 50,478 | 27 Sept 2026 | 30 d |
| 16 Feb 2026 | PR03 Regular replenishment | 2 | Rp 50,585 | 03 Apr 2026 | 46 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Jan 2026 | 6 | 201000012120 | Corrective |