Sparely
DU

ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B

Material 4100101905 · ANTIRUST · Plant 1000

CMonitorSlow-moving
Material
4100101905
Category
ANTIRUST
Base unit
CAN
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
24 d · P80 23 d
Unit price
Rp 50,532

Recommendation

  • 1.Forecast 1.3 CAN/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.1.
  • 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 6.
Single sourceSame description as 6 other material numbers
On hand / on order
6 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
6
order qty 6
Service level
98.6%
stockout risk now 0%
Unit price
Rp 50,532
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 247 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 3 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_2-IA-29658-A11A-HS
PIPE-2 FROM VD-622 TO HE-410D
C100.01
PX_3-BF-18205-A21A-HS
PIPE-3 FROM HE-149A TO VD-1479
C100.01
PX_3-IA-1757-B21A-H
PIPE-3 FROM VD-838 TO PP-408B
C100.01

Lead time and procurement

Lead time 24 ± 7 days (PO history + category, 2 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
28 Aug 2026PR03
Regular replenishment
2Rp 50,47827 Sept 202630 d
16 Feb 2026PR03
Regular replenishment
2Rp 50,58503 Apr 202646 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 Jan 20266201000012120Corrective