Sparely
DU

ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-B

Material 4100101926 · ANTIRUST · Plant 1000

CReducePotentially obsolete
Material
4100101926
Category
ANTIRUST
Base unit
CAN
MRP type
Stock Item
Criticality
C (0 of 4 FuncLocs A/B)
Supplier
ANUGRAH PERKASA MAKMUR PT
Lead time
14 d · P80 23 d
Unit price
Rp 83,707

Recommendation

  • 1.Forecast 0.0 CAN/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~14 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 197 exceeds the level to keep (0) by 197.
Convert to Non StockSingle sourceSame description as 5 other material numbers
On hand / on order
197 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 83,707
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10,496/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 4 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-LS-29947-D12A-C
PIPE-1 FROM VD-1731C TO PP-507
C100.01
PX_12-P-14843-A11A-C
PIPE-12 FROM HE-786 TO PP-128A
C100.01
PX_2-LS-14422-A22A-T
PIPE-2 FROM PP-140C TO VD-1514A
C100.01
PX_3/4-LS-23750-D12A-T
PIPE-3/4 FROM HE-1173C TO KC-843
C100.01

Lead time and procurement

Lead time 14 ± 7 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
21 Apr 2026PR03
Regular replenishment
1Rp 84,24502 May 202611 d
08 Aug 2025PR03
Regular replenishment
1Rp 83,16923 Aug 202515 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.