ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-A

Material 4100102415 · ANTIRUST · Plant 1000

CReduceExcess
Material
4100102415
Category
ANTIRUST
Base unit
CAN
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
15 d · P80 23 d
Unit price
Rp 72,991 (est.)

Recommendation

  • 1.Forecast 4.5 CAN/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~15 days; expected demand during lead time 0.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.Stock 14 exceeds the level to keep (10) by 4.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
14 / 0
no open PO
Today Min / Max
9 / 20
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.9%
stockout risk now 0%
Unit price
Rp 72,991
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 127 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-DS-24049-B23A-T
PIPE-1 FROM PP-1864A TO PP-455D
C100.01

Lead time and procurement

Lead time 15 ± 7 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 May 20261201000002035Corrective
26 May 20268201000002035Corrective