Sparely
DU

ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B

Material 4100102631 · ANTIRUST · Plant 1000

BMonitorInsurance gap
Material
4100102631
Category
ANTIRUST
Base unit
CAN
MRP type
Stock Item
Criticality
B (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
15 d · P80 23 d
Unit price
Rp 72,991 (est.)

Recommendation

  • 1.Forecast 0.0 CAN/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~15 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 6 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 72,991
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 50,923/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~9 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3-HS-21137-C11A-H
PIPE-3 FROM PP-479 TO PP-103
B100.01
PX_3/4-IA-4528-A22A-C
PIPE-3/4 FROM HE-1950 TO PP-1170
B100.01

Lead time and procurement

Lead time 15 ± 7 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.