ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-A

Material 4100102741 · ANTIRUST · Plant 1000

CTransferNormalBelow reorder point
Material
4100102741
Category
ANTIRUST
Base unit
CAN
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
GUNUNG SARANA SENTOSA PT
Lead time
16 d · P80 23 d
Unit price
Rp 81,114

Recommendation

  • 1.Forecast 0.5 CAN/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~16 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
  • 5.Identical part 4100102415 holds spare stock: transfer 1 CAN instead of buying — no purchase needed.
Single sourceSame description as 4 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 81,114
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 48 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-IA-28538-D12A-C
PIPE-3/4 FROM HE-931B TO PP-1706A
C100.01

Lead time and procurement

Lead time 16 ± 7 days (PO history + category, 2 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jun 2026PR06
Regular replenishment
1Rp 82,67211 Jul 202615 d
26 Dec 2025PR03
Regular replenishment
2Rp 79,55517 Jan 202622 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
14 Aug 20261201000012683Corrective