TAPE,PTFE,19MMX10M
Material 4100103434 · TAPE · Plant 1000
AReduceExcess
- Material
- 4100103434
- Category
- TAPE
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- A (2 of 12 FuncLocs A/B)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 45 d · P80 67 d
- Unit price
- Rp 10,296
Recommendation
- 1.Forecast 473 RL/year: 473 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~45 days; expected demand during lead time 58.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 175, order up to 648.
- 4.Stock 2,696 exceeds the level to keep (648) by 2,048.
- 5.Installed on 12 FuncLoc(s), 2 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 88Single sourceAbnormal consumptionOpen POSame description as 3 other material numbers
On hand / on order
2,696 / 891
next delivery 05 Oct 2026
Today Min / Max
67 / 155
static parameters in BoM
Rec. Min (reorder point)
175
safety stock 118
Rec. Max
648
order qty 473
Service level
99.9%
stockout risk now 0%
Unit price
Rp 10,296
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 49 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 13 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (198 units) excluded from the baseline.
Demand pattern Erratic · 149 issue days · 8 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 21.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 12 functional locations
2 with criticality A/B · 42 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-QO-7722-A21A-C PIPE-1 FROM HE-1081B TO PP-1303 | A | 5 | 0 | 0.01 |
| PX_1-CW-17409-B23A-T PIPE-1 FROM HE-1561D TO HE-686C | B | 4 | 0 | 0.01 |
| PX_1-1/2-HS-18026-A41A-HS PIPE-1-1/2 FROM VD-939 TO KC-853D | C | 3 | 0 | 0.01 |
| PX_10-CW-4305-A21A-T PIPE-10 FROM PP-417 TO CL-961 | C | 4 | 0 | 0.01 |
| PX_12-P-14843-A11A-C PIPE-12 FROM HE-786 TO PP-128A | C | 4 | 0 | 0.01 |
| PX_2-BF-17622-A41A-HS PIPE-2 FROM HE-1423C TO PP-517A | C | 2 | 0 | 0.01 |
| PX_3-LS-26814-B22A PIPE-3 FROM PP-1656A TO KC-265 | C | 4 | 0 | 0.01 |
| PX_3-QO-23806-D12A-T PIPE-3 FROM HE-1877D TO HE-731B | C | 5 | 0 | 0.01 |
| PX_3/4-BF-24551-B23A-C PIPE-3/4 FROM HE-156 TO HE-245 | C | 3 | 0 | 0.01 |
| PX_3/4-MS-21287-A41A PIPE-3/4 FROM VD-1292 TO HE-256 | C | 1 | 0 | 0.01 |
| PX_4-DS-8383-A51A-T PIPE-4 FROM HE-995C TO PP-120B | C | 4 | 0 | 0.01 |
| PX_4-P-7057-D12A PIPE-4 FROM VD-708 TO HE-1561D | C | 3 | 0 | 0.01 |
Lead time and procurement
Lead time 45 ± 24 days (PO history, 46 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Sept 2026 | PR03 Regular replenishment | 245 | Rp 10,299 | 12 Dec 2026 open | 81 d |
| 11 Sept 2026 | PR06 Regular replenishment | 259 | Rp 10,580 | 05 Oct 2026 open | 24 d |
| 26 Aug 2026 | PR06 Regular replenishment | 387 | Rp 10,497 | 31 Oct 2026 open | 66 d |
| 22 Jul 2026 | PR03 Regular replenishment | 221 | Rp 9,973 | 27 Sept 2026 | 67 d |
| 17 Jul 2026 | PR06 Regular replenishment | 423 | Rp 9,834 | 03 Aug 2026 | 17 d |
| 10 Jul 2026 | PR03 Regular replenishment | 442 | Rp 10,155 | 31 Jul 2026 | 21 d |
| 02 Jun 2026 | PR03 Regular replenishment | 314 | Rp 10,495 | 17 Jun 2026 | 15 d |
| 29 May 2026 | PR03 Regular replenishment | 185 | Rp 10,125 | 03 Jul 2026 | 35 d |
| 28 May 2026 | PR03 Regular replenishment | 371 | Rp 9,815 | 26 Jul 2026 | 59 d |
| 09 May 2026 | PR06 Regular replenishment | 335 | Rp 9,846 | 08 Jun 2026 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 5 | 201000015377 | Corrective |
| 27 Sept 2026 | 10 | 201000033332 | Corrective |
| 27 Sept 2026 | 12 | 209000029477 | Other maintenance |
| 25 Sept 2026 | 9 | 201000033463 | Corrective |
| 21 Sept 2026 | 1 | 201000010227 | Corrective |
| 21 Sept 2026 | 6 | 201000019618 | Corrective |
| 21 Sept 2026 | 3 | 206000035129 | Other maintenance |
| 18 Sept 2026 | 4 | 209000036917 | Other maintenance |
| 15 Sept 2026 | 1 | 201000001079 | Corrective |
| 11 Sept 2026 | 1 | 201000035065 | Corrective |
| 10 Sept 2026 | 3 | 201000015849 | Corrective |
| 10 Sept 2026 | 1 | 204000013108 | Preventive |
| 26 Aug 2026 | 5 | 201000004902 | Corrective |
| 25 Aug 2026 | 1 | 201000029784 | Corrective |
| 23 Aug 2026 | 3 | 201000000994 | Corrective |