TAPE,PTFE,12MMX10M

Material 4100103452 · TAPE · Plant 1000

AReduceExcess
Material
4100103452
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
A (2 of 13 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
23 d · P80 25 d
Unit price
Rp 29,157

Recommendation

  • 1.Forecast 149 RL/year: 149 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~23 days; expected demand during lead time 9.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 30, order up to 179.
  • 4.Stock 4,982 exceeds the level to keep (179) by 4,803.
  • 5.Installed on 13 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 92Single sourceAbnormal consumptionOpen POSame description as 2 other material numbers
On hand / on order
4,982 / 311
next delivery 05 Oct 2026
Today Min / Max
203 / 366
static parameters in BoM
Rec. Min (reorder point)
30
safety stock 21
Rec. Max
179
order qty 149
Service level
99.9%
stockout risk now 0%
Unit price
Rp 29,157
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 18 issue days in the last 180 days, last issue 21 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 13 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (124 units) excluded from the baseline.

Demand pattern Erratic · 72 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 13 functional locations

2 with criticality A/B · 44 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_4-LS-7492-A21A-H
PIPE-4 FROM PP-423A TO PP-254A
A500.01
PX_8-CW-14050-A51A-T
PIPE-8 FROM PP-682A TO HE-1479B
A300.01
PX_1-1/2-MS-18355-C11A-C
PIPE-1-1/2 FROM PP-1952C TO KC-137A
C410.01
PX_20-FG-22871-A41A-T
PIPE->16 FROM PP-817 TO VD-783
C310.44
PX_8-IA-11969-A22A-C
PIPE-8 FROM HE-668D TO HE-1396C
C310.01
PX_10-IA-12827-A21A-H
PIPE-10 FROM PP-1598B TO HE-1562C
C300.01
PX_10-MS-16802-C11A-HS
PIPE-10 FROM PP-1865A TO HE-1603
C300.01
PX_3-BF-11000-B22A-T
PIPE-3 FROM VD-1391A TO PP-247B
C100.01
PX_3/4-HS-12465-C11A
PIPE-3/4 FROM PP-1453B TO VD-980
C500.01
PX_3/4-IA-10141-A22A-HS
PIPE-3/4 FROM HE-528A TO PP-1063
C300.01
PX_4-CW-17491-C11A-T
PIPE-4 FROM HE-1334B TO CL-672
C500.01
PX_8-QO-5655-A21A
PIPE-8 FROM VD-1822 TO HE-1305B
C200.01

Lead time and procurement

Lead time 23 ± 12 days (PO history, 25 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
21 Sept 2026PR03
Regular replenishment
119Rp 29,54622 Nov 2026
open
62 d
09 Sept 2026PR03
Regular replenishment
69Rp 28,36305 Oct 2026
open
26 d
08 Sept 2026PR03
Regular replenishment
123Rp 28,11725 Oct 2026
open
47 d
20 Aug 2026PR03
Regular replenishment
85Rp 29,17117 Sept 202628 d
16 Aug 2026PR06
Regular replenishment
117Rp 29,32607 Sept 202622 d
24 Jul 2026PR03
Regular replenishment
179Rp 29,58231 Aug 202638 d
19 Jul 2026PR05
Project / turnaround
68Rp 29,46711 Aug 202623 d
14 Jul 2026PR03
Regular replenishment
114Rp 29,15708 Aug 202625 d
12 Jul 2026PR03
Regular replenishment
117Rp 27,60204 Aug 202623 d
12 Jun 2026PR06
Regular replenishment
98Rp 29,66523 Jun 202611 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jun 2025MediumPX_20-FG-22871-A41A-TThickness measurement 20-FG-22871-A41A-T
16 May 2025HighPX_1-1/2-MS-18355-C11A-CReplace lamp as per PM finding
07 May 2025HighPX_8-IA-11969-A22A-CReinject compound online clamp sealing

Recent goods issues

Posting dateQtyOrderOrder type
10 Sept 20263201000035065Corrective
29 Aug 20268203000017844Turnaround
27 Aug 20263201000016249Corrective
26 Aug 20267204000028673Preventive
14 Aug 20265201000039930Corrective
05 Aug 20265201000006273Corrective
27 Jul 20261201000005144Corrective
26 Jul 20265201000015146Corrective
19 Jul 20268201000035753Corrective
13 Jul 20262201000029732Corrective
08 Jul 20262201000012354Corrective
29 Jun 20261201000029365Corrective
20 Jun 20264209000014083Other maintenance
16 Jun 20262201000006665Corrective
15 May 20262201000007315Corrective