TAPE,PTFE,12MMX10M
Material 4100103452 · TAPE · Plant 1000
AReduceExcess
- Material
- 4100103452
- Category
- TAPE
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- A (2 of 13 FuncLocs A/B)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 23 d · P80 25 d
- Unit price
- Rp 29,157
Recommendation
- 1.Forecast 149 RL/year: 149 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~23 days; expected demand during lead time 9.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 30, order up to 179.
- 4.Stock 4,982 exceeds the level to keep (179) by 4,803.
- 5.Installed on 13 FuncLoc(s), 2 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 92Single sourceAbnormal consumptionOpen POSame description as 2 other material numbers
On hand / on order
4,982 / 311
next delivery 05 Oct 2026
Today Min / Max
203 / 366
static parameters in BoM
Rec. Min (reorder point)
30
safety stock 21
Rec. Max
179
order qty 149
Service level
99.9%
stockout risk now 0%
Unit price
Rp 29,157
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 18 issue days in the last 180 days, last issue 21 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 13 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (124 units) excluded from the baseline.
Demand pattern Erratic · 72 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 13 functional locations
2 with criticality A/B · 44 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_4-LS-7492-A21A-H PIPE-4 FROM PP-423A TO PP-254A | A | 5 | 0 | 0.01 |
| PX_8-CW-14050-A51A-T PIPE-8 FROM PP-682A TO HE-1479B | A | 3 | 0 | 0.01 |
| PX_1-1/2-MS-18355-C11A-C PIPE-1-1/2 FROM PP-1952C TO KC-137A | C | 4 | 1 | 0.01 |
| PX_20-FG-22871-A41A-T PIPE->16 FROM PP-817 TO VD-783 | C | 3 | 1 | 0.44 |
| PX_8-IA-11969-A22A-C PIPE-8 FROM HE-668D TO HE-1396C | C | 3 | 1 | 0.01 |
| PX_10-IA-12827-A21A-H PIPE-10 FROM PP-1598B TO HE-1562C | C | 3 | 0 | 0.01 |
| PX_10-MS-16802-C11A-HS PIPE-10 FROM PP-1865A TO HE-1603 | C | 3 | 0 | 0.01 |
| PX_3-BF-11000-B22A-T PIPE-3 FROM VD-1391A TO PP-247B | C | 1 | 0 | 0.01 |
| PX_3/4-HS-12465-C11A PIPE-3/4 FROM PP-1453B TO VD-980 | C | 5 | 0 | 0.01 |
| PX_3/4-IA-10141-A22A-HS PIPE-3/4 FROM HE-528A TO PP-1063 | C | 3 | 0 | 0.01 |
| PX_4-CW-17491-C11A-T PIPE-4 FROM HE-1334B TO CL-672 | C | 5 | 0 | 0.01 |
| PX_8-QO-5655-A21A PIPE-8 FROM VD-1822 TO HE-1305B | C | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 23 ± 12 days (PO history, 25 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Sept 2026 | PR03 Regular replenishment | 119 | Rp 29,546 | 22 Nov 2026 open | 62 d |
| 09 Sept 2026 | PR03 Regular replenishment | 69 | Rp 28,363 | 05 Oct 2026 open | 26 d |
| 08 Sept 2026 | PR03 Regular replenishment | 123 | Rp 28,117 | 25 Oct 2026 open | 47 d |
| 20 Aug 2026 | PR03 Regular replenishment | 85 | Rp 29,171 | 17 Sept 2026 | 28 d |
| 16 Aug 2026 | PR06 Regular replenishment | 117 | Rp 29,326 | 07 Sept 2026 | 22 d |
| 24 Jul 2026 | PR03 Regular replenishment | 179 | Rp 29,582 | 31 Aug 2026 | 38 d |
| 19 Jul 2026 | PR05 Project / turnaround | 68 | Rp 29,467 | 11 Aug 2026 | 23 d |
| 14 Jul 2026 | PR03 Regular replenishment | 114 | Rp 29,157 | 08 Aug 2026 | 25 d |
| 12 Jul 2026 | PR03 Regular replenishment | 117 | Rp 27,602 | 04 Aug 2026 | 23 d |
| 12 Jun 2026 | PR06 Regular replenishment | 98 | Rp 29,665 | 23 Jun 2026 | 11 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Jun 2025 | Medium | PX_20-FG-22871-A41A-T | Thickness measurement 20-FG-22871-A41A-T |
| 16 May 2025 | High | PX_1-1/2-MS-18355-C11A-C | Replace lamp as per PM finding |
| 07 May 2025 | High | PX_8-IA-11969-A22A-C | Reinject compound online clamp sealing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Sept 2026 | 3 | 201000035065 | Corrective |
| 29 Aug 2026 | 8 | 203000017844 | Turnaround |
| 27 Aug 2026 | 3 | 201000016249 | Corrective |
| 26 Aug 2026 | 7 | 204000028673 | Preventive |
| 14 Aug 2026 | 5 | 201000039930 | Corrective |
| 05 Aug 2026 | 5 | 201000006273 | Corrective |
| 27 Jul 2026 | 1 | 201000005144 | Corrective |
| 26 Jul 2026 | 5 | 201000015146 | Corrective |
| 19 Jul 2026 | 8 | 201000035753 | Corrective |
| 13 Jul 2026 | 2 | 201000029732 | Corrective |
| 08 Jul 2026 | 2 | 201000012354 | Corrective |
| 29 Jun 2026 | 1 | 201000029365 | Corrective |
| 20 Jun 2026 | 4 | 209000014083 | Other maintenance |
| 16 Jun 2026 | 2 | 201000006665 | Corrective |
| 15 May 2026 | 2 | 201000007315 | Corrective |