Sparely
DU

TAPE,PTFE,12MMX15M

Material 4100103474 · TAPE · Plant 1000

AMonitorHealthy
Material
4100103474
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
A (1 of 6 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
13 d · P80 13 d
Unit price
Rp 12,196

Recommendation

  • 1.Forecast 126 RL/year: 126 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~13 days; expected demand during lead time 4.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 24, order up to 151.
  • 4.Installed on 6 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 34Single sourceAbnormal consumption
On hand / on order
98 / 0
no open PO
Today Min / Max
65 / 117
static parameters in BoM
Rec. Min (reorder point)
24
safety stock 20
Rec. Max
151
order qty 127
Service level
100.0%
stockout risk now 0%
Unit price
Rp 12,196
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 14 issue days in the last 180 days, last issue 3 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (66 units) excluded from the baseline.

Demand pattern Erratic · 53 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 6 functional locations

1 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_8-CW-14050-A51A-T
PIPE-8 FROM PP-682A TO HE-1479B
A100.01
PX_1-CW-25324-A21A-T
PIPE-1 FROM PP-1536B TO HE-1788D
C500.01
PX_1-DS-12569-A11A-HS
PIPE-1 FROM VD-1035D TO KC-222B
C500.01
PX_10-DS-5183-B21A-T
PIPE-10 FROM VD-1641A TO CL-348
C100.01
PX_12-LS-11671-C11A-T
PIPE-12 FROM KC-228B TO VD-1974D
C400.01
PX_3-DS-26638-B21A
PIPE-3 FROM HE-1772B TO HE-1683B
C400.01

Lead time and procurement

Lead time 13 ± 7 days (PO history, 14 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
02 Aug 2026PR03
Regular replenishment
113Rp 12,15312 Aug 202610 d
17 Jun 2026PR03
Regular replenishment
103Rp 12,48411 Jul 202624 d
27 Mar 2026PR06
Regular replenishment
67Rp 11,76702 Apr 20266 d
03 Mar 2026PR06
Regular replenishment
120Rp 12,12408 Mar 20265 d
15 Jan 2026PR06
Regular replenishment
89Rp 12,43521 Jan 20266 d
23 Dec 2025PR06
Regular replenishment
109Rp 11,92113 Jan 202621 d
23 Nov 2025PR03
Regular replenishment
112Rp 12,39001 Dec 20258 d
27 Oct 2025PR06
Regular replenishment
130Rp 12,04409 Nov 202513 d
18 Oct 2025PR04
Regular (other)
109Rp 12,34527 Oct 20259 d
01 Aug 2025PR06
Regular replenishment
108Rp 12,28514 Aug 202513 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
28 Sept 20263201000002725Corrective
05 Sept 202612201000005647Corrective
28 Aug 20262201000033538Corrective
09 Aug 20261201000001982Corrective
31 Jul 20261201000002390Corrective
15 Jul 20267201000019779Corrective
04 Jul 20269201000038942Corrective
15 Jun 20263201000030870Corrective
12 Jun 20262201000023683Corrective
24 May 20261201000012062Corrective
05 May 202612201000029629Corrective
30 Apr 202624203000029810Turnaround
13 Apr 20262201000004394Corrective
08 Apr 20261201000030856Corrective
06 Apr 20263204000035653Preventive