Sparely
DU

TAPE,PTFE,19MMX15M

Material 4100103502 · TAPE · Plant 1000

CReorderHighBelow reorder point
Material
4100103502
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
21 d · P80 27 d
Unit price
Rp 13,443

Recommendation

  • 1.Forecast 106 RL/year: 106 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~21 days; expected demand during lead time 6.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 24, order up to 131.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 127 now.
  • 5.ML early warning: 99% probability of demand in the next 90 days.
  • 6.Identical part 4100104353, 4100103607, 4100104489, 4100104110, 4100104014 holds spare stock: transfer 17 RL instead of buying, then buy the remaining 110.
Proposed purchase requisition
110 RL
Rp 1.5M · order by 01 Oct 2026
Expected arrival ≈ 21 days
ML early warningLast turnaround used 44Single sourceAbnormal consumptionSame description as 5 other material numbers
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
24
safety stock 18
Rec. Max
131
order qty 107
Service level
99.9%
stockout risk now 47%
Unit price
Rp 13,443
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 13 issue days in the last 180 days, last issue 17 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (44 units) excluded from the baseline.

Demand pattern Erratic · 41 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 146.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 2 functional locations

0 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_8-P-23318-B23A
PIPE-8 FROM HE-105D TO PP-1638B
C310.01
PX_2-QO-8847-C11A-C
PIPE-2 FROM HE-132D TO HE-686C
C300.01

Lead time and procurement

Lead time 21 ± 13 days (PO history, 18 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
05 Sept 2026PR03
Regular replenishment
59Rp 13,50727 Sept 202622 d
24 May 2026PR03
Regular replenishment
84Rp 13,28118 Jun 202625 d
20 May 2026PR03
Regular replenishment
80Rp 13,58829 May 20269 d
29 Apr 2026PR06
Regular replenishment
97Rp 13,13018 May 202619 d
18 Apr 2026PR06
Regular replenishment
73Rp 13,25709 May 202621 d
21 Feb 2026PR05
Project / turnaround
62Rp 13,71416 Apr 202654 d
03 Jan 2026PR03
Regular replenishment
33Rp 13,39222 Jan 202619 d
30 Nov 2025PR03
Regular replenishment
58Rp 13,10209 Dec 20259 d
28 Nov 2025PR06
Regular replenishment
67Rp 14,02605 Dec 20257 d
11 Nov 2025PR06
Regular replenishment
55Rp 13,33622 Nov 202511 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 May 2025MediumPX_8-P-23318-B23ALeak at 8-P-23318-B23A

Recent goods issues

Posting dateQtyOrderOrder type
14 Sept 20261201000001040Corrective
07 Sept 20262201000016909Corrective
27 Aug 20262201000029784Corrective
23 Aug 20262201000013554Corrective
27 Jul 20261201000031994Corrective
27 Jun 20269201000033111Corrective
20 Jun 20261201000017456Corrective
20 Jun 20261201000022261Corrective
17 Jun 20268201000027561Corrective
17 Jun 20262209000016742Other maintenance
30 May 20261201000020779Corrective
28 May 20265201000005642Corrective
09 May 20261201000013238Corrective
06 May 20269201000008566Corrective
19 Apr 20262209000024091Other maintenance