Sparely
DU

TAPE,PTFE,25MMX10M

Material 4100103540 · TAPE · Plant 1000

CMonitorStockout
Material
4100103540
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
21 d · P80 26 d
Unit price
Rp 8,964

Recommendation

  • 1.Forecast 65 RL/year: 65 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~21 days; expected demand during lead time 3.7.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 16, order up to 82.
  • 4.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 44Single sourceAbnormal consumptionOpen POSame description as 4 other material numbers
On hand / on order
0 / 82
next delivery 05 Oct 2026
Today Min / Max
9 / 22
static parameters in BoM
Rec. Min (reorder point)
16
safety stock 13
Rec. Max
82
order qty 66
Service level
99.8%
stockout risk now 0%
Unit price
Rp 8,964
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 17 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (44 units) excluded from the baseline.

Demand pattern Erratic · 43 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 114.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 2 functional locations

0 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_16-P-4200-B23A-H
PIPE->16 FROM HE-1637B TO VD-842
C300.01
PX_3/4-HS-27123-C11A-T
PIPE-3/4 FROM HE-621 TO HE-1675
C300.01

Lead time and procurement

Lead time 21 ± 9 days (PO history, 13 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
15 Sept 2026PR03
Regular replenishment
82Rp 8,96405 Oct 2026
open
20 d
10 Jun 2026PR03
Regular replenishment
86Rp 9,01504 Jul 202624 d
27 May 2026PR03
Regular replenishment
25Rp 9,19413 Jun 202617 d
14 May 2026PR03
Regular replenishment
25Rp 8,69630 May 202616 d
29 Apr 2026PR06
Regular replenishment
62Rp 8,89026 May 202627 d
11 Apr 2026PR03
Regular replenishment
29Rp 8,44201 May 202620 d
16 Mar 2026PR03
Regular replenishment
50Rp 9,02129 Mar 202613 d
20 Jan 2026PR06
Regular replenishment
22Rp 8,93811 Feb 202622 d
02 Jan 2026PR03
Regular replenishment
80Rp 9,10503 Feb 202632 d
01 Jan 2026PR03
Regular replenishment
64Rp 9,01902 Feb 202632 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
14 Sept 20263201000001859Corrective
14 Sept 20261201000013324Corrective
25 Aug 20262201000011526Corrective
15 Jul 20262201000023891Corrective
16 Jun 20262201000034900Corrective
08 Jun 20263201000006846Corrective
29 May 202610201000005175Corrective
09 May 20262201000013238Corrective
17 Feb 20261206000011618Other maintenance
15 Jan 20263201000001165Corrective
28 Dec 20251201000035558Corrective
25 Dec 20255201000012650Corrective
24 Dec 202510203000006078Turnaround
24 Dec 20252203000006078Turnaround
23 Dec 202518203000033370Turnaround