TAPE,PTFE,19MMX10M

Material 4100103691 · TAPE · Plant 1000

CReducePotentially obsolete
Material
4100103691
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
22 d · P80 41 d
Unit price
Rp 26,317

Recommendation

  • 1.Forecast 0.0 RL/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~22 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 4 exceeds the level to keep (0) by 4.
Convert to Non StockSingle sourceOpen POSame description as 3 other material numbers
On hand / on order
4 / 2
next delivery 01 Oct 2026
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 26,317
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2,727/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 1 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_16-HS-5180-D12A-H
PIPE->16 FROM HE-320A TO HE-1334
C300.01

Lead time and procurement

Lead time 22 ± 15 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
14 Sept 2026PR06
Regular replenishment
2Rp 26,31001 Oct 2026
open
17 d
19 Sept 2025PR06
Regular replenishment
2Rp 26,32312 Oct 202523 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.