TAPE,PTFE,25MMX15M
Material 4100103722 · TAPE · Plant 1000
CTransferNormalBelow reorder point
- Material
- 4100103722
- Category
- TAPE
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 25 d · P80 41 d
- Unit price
- Rp 10,154
Recommendation
- 1.Forecast 2.8 RL/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~25 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
- 4.On hand 1 + on order 0 is at or below the reorder point: 7 needed.
- 5.Identical part 4100103558, 4100104039, 4100103642 holds spare stock: transfer 7 RL instead of buying — no purchase needed.
Single sourceSame description as 4 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
100.0%
stockout risk now 7%
Unit price
Rp 10,154
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 102 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.
Installed on 2 functional locations
0 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-QO-8584-A21A-C PIPE-1 FROM VD-1239 TO PP-410 | C | 4 | 0 | 0.01 |
| PX_3/4-HS-24889-A21A-C PIPE-3/4 FROM PP-891C TO PP-280A | C | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 25 ± 15 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Nov 2025 | PR05 Project / turnaround | 1 | Rp 10,272 | 28 Nov 2025 | 26 d |
| 03 Oct 2025 | PR04 Regular (other) | 1 | Rp 10,035 | 01 Nov 2025 | 29 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Jun 2026 | 3 | 201000022261 | Corrective |
| 20 Jun 2026 | 2 | 201000022261 | Corrective |