Sparely
DU

TAPE,PTFE,19MMX10M

Material 4100103734 · TAPE · Plant 1000

CReducePotentially obsolete
Material
4100103734
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 13,097 (est.)

Recommendation

  • 1.Forecast 0.1 RL/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.0.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.Stock 11 exceeds the level to keep (4) by 7.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
11 / 0
no open PO
Today Min / Max
5 / 11
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.8%
stockout risk now 0%
Unit price
Rp 13,097
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 191,134/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 2 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-FG-20458-A41A-HS
PIPE-3/4 FROM HE-600D TO VD-1218
C130.87
PX_8-BF-2675-A11A
PIPE-8 FROM HE-1813A TO VD-1010A
C300.01

Lead time and procurement

Lead time 24 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Aug 2026MediumPX_3/4-FG-20458-A41A-HSReplace lamp as per PM finding
27 Dec 2025MediumPX_3/4-FG-20458-A41A-HSClean dummy leg 3/4-FG-20458-A41A-HS
24 May 2025MediumPX_3/4-FG-20458-A41A-HSReinject compound online clamp sealing

Recent goods issues

Never issued in the 17-month history.