TAPE,PTFE,25MMX10M

Material 4100103805 · TAPE · Plant 1000

CReorderNormalBelow reorder point
Material
4100103805
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 13,097 (est.)

Recommendation

  • 1.Forecast 3.5 RL/year: 3.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 8 now.
Proposed purchase requisition
8 RL
Rp 104,776 · order by 01 Oct 2026
Expected arrival ≈ 24 days
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
100.0%
stockout risk now 7%
Unit price
Rp 13,097
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 88 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 2 functional locations

0 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-LS-3481-C11A-T
PIPE-1 FROM PP-1524A TO CL-682
C400.01
PX_2-P-1882-B21A
PIPE-2 FROM HE-605 TO HE-1473C
C100.01

Lead time and procurement

Lead time 24 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
05 Jul 20262201000038942Corrective
04 Jul 20261201000038942Corrective
04 Jul 20263201000038942Corrective