TAPE,PTFE,19MMX15M
Material 4100104353 · TAPE · Plant 1000
CMonitorSlow-moving
- Material
- 4100104353
- Category
- TAPE
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- DUTA UTAMA PERSADA PT
- Lead time
- 20 d · P80 17 d
- Unit price
- Rp 25,086
Recommendation
- 1.Forecast 0.5 RL/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~20 days; expected demand during lead time 0.0.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
Single sourceSame description as 5 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.3%
stockout risk now 1%
Unit price
Rp 25,086
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 384 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 674,996/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.
Installed on 1 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-FG-3358-D12A-C PIPE-1 FROM KC-223 TO PP-128A | C | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 20 ± 9 days (PO history, 3 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Mar 2026 | PR03 Regular replenishment | 2 | Rp 23,692 | 11 Apr 2026 | 12 d |
| 20 Dec 2025 | PR03 Regular replenishment | 1 | Rp 25,086 | 07 Jan 2026 | 18 d |
| 28 Sept 2025 | PR03 Regular replenishment | 1 | Rp 25,374 | 14 Oct 2025 | 16 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Sept 2025 | 1 | 201000013839 | Corrective |
| 12 Sept 2025 | 3 | 201000013839 | Corrective |