TAPE,PTFE,25MMX10M

Material 4100104775 · TAPE · Plant 1000

BReorderCriticalStockout
Material
4100104775
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
20 d · P80 19 d
Unit price
Rp 13,097

Recommendation

  • 1.Forecast 0.6 RL/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100105035 holds spare stock: transfer 2 RL instead of buying, then buy the remaining 4.
Proposed purchase requisition
4 RL
Rp 52,388 · order by 01 Oct 2026
Expected arrival ≈ 20 days
Single sourceSame description as 4 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 1%
Unit price
Rp 13,097
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.

Installed on 2 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_10-DS-4865-A11A-H
PIPE-10 FROM VD-1974D TO KC-293B
B120.44
PX_10-P-18581-C11A-H
PIPE-10 FROM KC-202 TO HE-1205D
C510.01

Lead time and procurement

Lead time 20 ± 10 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jul 2026PR03
Regular replenishment
1Rp 12,40716 Aug 202620 d
02 May 2026PR06
Regular replenishment
2Rp 13,25411 May 20269 d
02 Aug 2025PR06
Regular replenishment
2Rp 13,09720 Aug 202518 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Jul 2026MediumPX_10-DS-4865-A11A-HThickness measurement 10-DS-4865-A11A-H
07 May 2025MediumPX_10-DS-4865-A11A-HThickness measurement 10-DS-4865-A11A-H
05 May 2025MediumPX_10-P-18581-C11A-HPSM25/Replace pipe 10-P-18581-C11A-H

Recent goods issues

Posting dateQtyOrderOrder type
17 May 20253201000013692Corrective