TAPE,PTFE,25MMX10M
Material 4100104775 · TAPE · Plant 1000
BReorderCriticalStockout
- Material
- 4100104775
- Category
- TAPE
- Base unit
- RL
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 20 d · P80 19 d
- Unit price
- Rp 13,097
Recommendation
- 1.Forecast 0.6 RL/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~20 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
- 6.Identical part 4100105035 holds spare stock: transfer 2 RL instead of buying, then buy the remaining 4.
Proposed purchase requisition
4 RL
Rp 52,388 · order by 01 Oct 2026
Expected arrival ≈ 20 days
Single sourceSame description as 4 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 1%
Unit price
Rp 13,097
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.
Installed on 2 functional locations
1 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_10-DS-4865-A11A-H PIPE-10 FROM VD-1974D TO KC-293B | B | 1 | 2 | 0.44 |
| PX_10-P-18581-C11A-H PIPE-10 FROM KC-202 TO HE-1205D | C | 5 | 1 | 0.01 |
Lead time and procurement
Lead time 20 ± 10 days (PO history, 3 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Jul 2026 | PR03 Regular replenishment | 1 | Rp 12,407 | 16 Aug 2026 | 20 d |
| 02 May 2026 | PR06 Regular replenishment | 2 | Rp 13,254 | 11 May 2026 | 9 d |
| 02 Aug 2025 | PR06 Regular replenishment | 2 | Rp 13,097 | 20 Aug 2025 | 18 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Jul 2026 | Medium | PX_10-DS-4865-A11A-H | Thickness measurement 10-DS-4865-A11A-H |
| 07 May 2025 | Medium | PX_10-DS-4865-A11A-H | Thickness measurement 10-DS-4865-A11A-H |
| 05 May 2025 | Medium | PX_10-P-18581-C11A-H | PSM25/Replace pipe 10-P-18581-C11A-H |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 May 2025 | 3 | 201000013692 | Corrective |