TAPE,PTFE,25MMX15M

Material 4100104898 · TAPE · Plant 1000

CTransferNormalSlow-moving
Material
4100104898
Category
TAPE
Base unit
RL
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 13,097 (est.)

Recommendation

  • 1.Forecast 0.1 RL/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
  • 5.Identical part 4100103642 holds spare stock: transfer 1 RL instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 13,097
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 377 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 692,917/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 1 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-FG-10740-A41A-C
PIPE-3/4 FROM HE-1903 TO HE-118B
C200.01

Lead time and procurement

Lead time 24 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
19 Sept 20251201000022192Corrective