SCREEN,WIRE,TYPE CF689,NBR
Material 4100105145 · SCREEN · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100105145
- Category
- SCREEN
- Base unit
- SHT
- MRP type
- Stock Item
- Criticality
- A (13 of 16 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 74 d · P80 132 d
- Unit price
- Rp 480,616
Recommendation
- 1.Forecast 3.0 SHT/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 0.6.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 9.
- 4.On hand 4 + on order 1 is at or below the reorder point: order 4 now.
- 5.Long lead time: 80% of deliveries took up to 132 days and the fastest seen in its category 21 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 16 FuncLoc(s), 13 of them criticality A/B.
- 7.ML early warning: 30% probability of demand in the next 90 days.
Proposed purchase requisition
4 SHT
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Long-leadML early warningSingle sourceAbnormal consumptionOpen PO
On hand / on order
4 / 1
next delivery 15 Oct 2026
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
9
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 480,616
PO history
ML early warning: 30% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 300 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 833.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 16 functional locations
13 with criticality A/B · 16 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-816 WASH WATER STRIPPER | A | 1 | 1 | 0.38 |
| PX_CL-894 COOLING WATER COLUMN | A | 1 | 1 | 0.38 |
| PX_VD-973 QUENCH OIL ACCUMULATOR | A | 1 | 1 | 0.08 |
| PX_CL-1290 PROPYLENE STRIPPER | A | 1 | 0 | 0.38 |
| PX_CL-473 QUENCH OIL SCRUBBER | A | 1 | 0 | 0.38 |
| PX_VD-1038 CONDENSATE SEPARATOR | A | 1 | 0 | 0.08 |
| PX_VD-1921A QUENCH WATER DRUM | A | 1 | 0 | 0.08 |
| PX_CL-348 SEAL OIL TOWER | B | 1 | 3 | 0.81 |
| PX_VD-623 C3 RECYCLE DRUM | B | 1 | 3 | 0.93 |
| PX_VD-103 C3 RECYCLE SEPARATOR | B | 1 | 1 | 0.08 |
| PX_VD-526 RECYCLE ETHANE DRUM | B | 1 | 0 | 0.08 |
| PX_VD-708 HYDROGEN KO DRUM | B | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 74 ± 44 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Jul 2026 | PR06 Regular replenishment | 1 | Rp 480,616 | 15 Oct 2026 open | 77 d |
| 23 Jul 2026 | PR03 Regular replenishment | 4 | Rp 462,357 | 18 Sept 2026 | 57 d |
| 11 Aug 2025 | PR05 Project / turnaround | 3 | Rp 486,902 | 26 Jan 2026 | 168 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Sept 2026 | Low | PX_CL-348 | Leak from packing |
| 15 Mar 2026 | Low | PX_CL-348 | Install scaffolding at CL-348 |
| 24 Feb 2026 | Medium | PX_VD-623 | Install scaffolding at VD-623 |
| 13 Jan 2026 | High | PX_CL-1165 | Install scaffolding at CL-1165 |
| 11 Dec 2025 | Medium | PX_VD-623 | Repair insulation VD-623 |
| 07 Dec 2025 | Medium | PX_CL-1165 | Replace lamp as per PM finding |
| 01 Dec 2025 | Medium | PX_CL-1165 | Install scaffolding at CL-1165 |
| 27 Sept 2025 | Medium | PX_CL-1165 | CL-1165 DP high |
| 03 Aug 2025 | Low | PX_CL-1165 | Install scaffolding at CL-1165 |
| 09 Jun 2025 | Low | PX_VD-623 | VD-623 level glass broken |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Dec 2025 | 1 | 201000018271 | Corrective |
| 19 Sept 2025 | 1 | 201000006282 | Corrective |
| 05 Aug 2025 | 2 | 201000021189 | Corrective |
| 22 Jul 2025 | 1 | 201000016875 | Corrective |
| 19 May 2025 | 4 | 201000008137 | Corrective |