SCREEN,WIRE,TYPE CF689,NBR

Material 4100105145 · SCREEN · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100105145
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
A (13 of 16 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
74 d · P80 132 d
Unit price
Rp 480,616

Recommendation

  • 1.Forecast 3.0 SHT/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 9.
  • 4.On hand 4 + on order 1 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 132 days and the fastest seen in its category 21 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 16 FuncLoc(s), 13 of them criticality A/B.
  • 7.ML early warning: 30% probability of demand in the next 90 days.
Proposed purchase requisition
4 SHT
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Long-leadML early warningSingle sourceAbnormal consumptionOpen PO
On hand / on order
4 / 1
next delivery 15 Oct 2026
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
9
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 480,616
PO history
ML early warning: 30% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 300 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 833.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 16 functional locations

13 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-816
WASH WATER STRIPPER
A110.38
PX_CL-894
COOLING WATER COLUMN
A110.38
PX_VD-973
QUENCH OIL ACCUMULATOR
A110.08
PX_CL-1290
PROPYLENE STRIPPER
A100.38
PX_CL-473
QUENCH OIL SCRUBBER
A100.38
PX_VD-1038
CONDENSATE SEPARATOR
A100.08
PX_VD-1921A
QUENCH WATER DRUM
A100.08
PX_CL-348
SEAL OIL TOWER
B130.81
PX_VD-623
C3 RECYCLE DRUM
B130.93
PX_VD-103
C3 RECYCLE SEPARATOR
B110.08
PX_VD-526
RECYCLE ETHANE DRUM
B100.08
PX_VD-708
HYDROGEN KO DRUM
B100.08

Lead time and procurement

Lead time 74 ± 44 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
30 Jul 2026PR06
Regular replenishment
1Rp 480,61615 Oct 2026
open
77 d
23 Jul 2026PR03
Regular replenishment
4Rp 462,35718 Sept 202657 d
11 Aug 2025PR05
Project / turnaround
3Rp 486,90226 Jan 2026168 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026LowPX_CL-348Leak from packing
15 Mar 2026LowPX_CL-348Install scaffolding at CL-348
24 Feb 2026MediumPX_VD-623Install scaffolding at VD-623
13 Jan 2026HighPX_CL-1165Install scaffolding at CL-1165
11 Dec 2025MediumPX_VD-623Repair insulation VD-623
07 Dec 2025MediumPX_CL-1165Replace lamp as per PM finding
01 Dec 2025MediumPX_CL-1165Install scaffolding at CL-1165
27 Sept 2025MediumPX_CL-1165CL-1165 DP high
03 Aug 2025LowPX_CL-1165Install scaffolding at CL-1165
09 Jun 2025LowPX_VD-623VD-623 level glass broken

Recent goods issues

Posting dateQtyOrderOrder type
05 Dec 20251201000018271Corrective
19 Sept 20251201000006282Corrective
05 Aug 20252201000021189Corrective
22 Jul 20251201000016875Corrective
19 May 20254201000008137Corrective