SCREEN,WIRE,TYPE BF417,GRAPHITE

Material 4100105167 · SCREEN · Plant 1000

AReduceNon-moving
Material
4100105167
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
48 d · P80 65 d
Unit price
Rp 421,534 (est.)

Recommendation

  • 1.Forecast 0.1 SHT/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~48 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Stock 13 exceeds the level to keep (4) by 9.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
13 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 421,534
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 31.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 5 functional locations

4 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_CL-1481
CONDENSATE COLUMN
A110.38
PX_CL-159
C4 PRODUCT TOWER
A100.38
PX_VD-1921A
QUENCH WATER DRUM
A100.08
PX_VD-793A
SPENT CAUSTIC SURGE DRUM
A100.08
PX_CL-1019
BFW COLUMN
S120.81

Lead time and procurement

Lead time 48 ± 28 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Nov 2025MediumPX_CL-1019CL-1019 DP high
01 Jul 2025HighPX_CL-1019Install scaffolding at CL-1019
02 May 2025LowPY_CL-1481CL-1481 DP high

Recent goods issues

Never issued in the 17-month history.