SCREEN,WIRE,TYPE AQ973,A105

Material 4100105194 · SCREEN · Plant 1000

BMonitorSlow-moving
Material
4100105194
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
B (2 of 4 FuncLocs A/B)
Supplier
GEMILANG MANDIRI INTERNASIONAL PT
Lead time
41 d · P80 43 d
Unit price
Rp 996,036

Recommendation

  • 1.Forecast 1.6 SHT/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~41 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Single sourceOpen PO
On hand / on order
5 / 2
next delivery 07 Oct 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 996,036
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 107.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-733
INHIBITOR SEPARATOR
B120.51
PX_VD-688
COOLING WATER SURGE DRUM
B100.08
PX_CL-1546
LUBE OIL COLUMN
S100.38
PX_CL-899
SLOP OIL COLUMN
S100.38

Lead time and procurement

Lead time 41 ± 22 days (PO history, 3 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2026PR03
Regular replenishment
2Rp 974,57707 Oct 2026
open
30 d
01 Dec 2025PR03
Regular replenishment
2Rp 1.0M22 Dec 202521 d
15 Aug 2025PR03
Regular replenishment
2Rp 996,03605 Oct 202551 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Nov 2025MediumPX_VD-733Inspect VD-733
30 May 2025MediumPX_VD-733Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
10 Jan 20261201000030058Corrective
26 Sept 20253201000037569Corrective
02 Jun 20251201000026064Corrective