SCREEN,WIRE,MODEL DN944,A182F11
Material 4100105207 · SCREEN · Plant 1000
AReduceSlow-moving
- Material
- 4100105207
- Category
- SCREEN
- Base unit
- SHT
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 48 d · P80 65 d
- Unit price
- Rp 421,534 (est.)
Recommendation
- 1.Forecast 0.7 SHT/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~48 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 6 exceeds the level to keep (3) by 3.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 421,534
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 373 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 289.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 5 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-694A C3 RECYCLE ACCUMULATOR | A | 1 | 3 | 0.93 |
| PX_VD-1729 PROPYLENE KO DRUM | A | 1 | 2 | 0.08 |
| PX_VD-1210 C4 PRODUCT ACCUMULATOR | A | 1 | 0 | 0.08 |
| PX_CL-1546 LUBE OIL COLUMN | S | 1 | 0 | 0.38 |
| PX_CL-899 SLOP OIL COLUMN | S | 1 | 0 | 0.38 |
Lead time and procurement
Lead time 48 ± 28 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Jun 2026 | Low | PX_VD-694A | Leak from packing |
| 07 Mar 2026 | Medium | PX_VD-1729 | Install scaffolding at VD-1729 |
| 01 Oct 2025 | Medium | PX_VD-694A | Inspect VD-694A |
| 09 May 2025 | Medium | PX_VD-694A | PSM25/Replace lamp as per PM finding |
| 06 May 2025 | Medium | PX_VD-1729 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Sept 2025 | 1 | 201000009247 | Corrective |