SCREEN,WIRE,SIZE ID577,SS304
Material 4100105243 · SCREEN · Plant 1000
AReduceNon-moving
- Material
- 4100105243
- Category
- SCREEN
- Base unit
- SHT
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- BERKAH ENERGI MAKMUR PT
- Lead time
- 35 d · P80 65 d
- Unit price
- Rp 943,273
Recommendation
- 1.Forecast 0.0 SHT/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~35 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 24 exceeds the level to keep (2) by 22.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
24 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 943,273
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-473 QUENCH OIL SCRUBBER | A | 1 | 0 | 0.38 |
Lead time and procurement
Lead time 35 ± 28 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 May 2026 | PR06 Regular replenishment | 2 | Rp 908,533 | 17 May 2026 | 9 d |
| 09 Aug 2025 | PR06 Regular replenishment | 1 | Rp 978,012 | 29 Aug 2025 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.