SCREEN,WIRE,TYPE MU811,VITON

Material 4100105273 · SCREEN · Plant 1000

AReorderCriticalStockout
Material
4100105273
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
NUSA ELEKTRIK SENTOSA PT
Lead time
52 d · P80 65 d
Unit price
Rp 319,462

Recommendation

  • 1.Forecast 3.0 SHT/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~52 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
8 SHT
Rp 2.6M · order by 01 Oct 2026
Expected arrival ≈ 52 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
100.0%
stockout risk now 24%
Unit price
Rp 319,462
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 41 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 869.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_VD-1729
METHANE KO DRUM
A100.08
PY_CL-890
CONDENSATE SCRUBBER
B131.23
PX_CL-443
COOLING WATER SCRUBBER
S162.52

Lead time and procurement

Lead time 52 ± 28 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
12 Dec 2025PR05
Project / turnaround
2Rp 316,88916 Feb 202666 d
07 Jun 2025PR04
Regular (other)
1Rp 322,03525 Jul 202548 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Sept 2026MediumPX_CL-443Replace lamp as per PM finding
09 Jul 2026HighPX_CL-443CL-443 DP high
25 Jun 2026MediumPX_CL-443Leak from packing
20 Jun 2026LowPY_CL-890Leak from packing
01 May 2026MediumPX_CL-443Install scaffolding at CL-443
31 Jan 2026MediumPY_CL-890Leak from packing
30 Jan 2026LowPX_CL-443Replace lamp as per PM finding
18 Jun 2025MediumPX_CL-443PSM25/CL-443 DP high
31 May 2025LowPY_CL-890Inspect CL-890 internal

Recent goods issues

Posting dateQtyOrderOrder type
21 Aug 20262201000019311Corrective
02 May 20261201000030476Corrective