Sparely
DU

SCREEN,WIRE,TYPE HB424,A105

Material 4100105310 · SCREEN · Plant 1000

AReduceNon-moving
Material
4100105310
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
48 d · P80 65 d
Unit price
Rp 421,534 (est.)

Recommendation

  • 1.Forecast 0.2 SHT/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~48 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Stock 11 exceeds the level to keep (4) by 7.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
11 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 421,534
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 48.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-617
QUENCH OIL COLUMN
A152.52
PX_VD-1248
FUEL OIL ACCUMULATOR
A100.08
PY_VD-157B
GASOLINE KO DRUM
A100.08

Lead time and procurement

Lead time 48 ± 28 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_CL-617Inspect CL-617 internal
05 Aug 2026MediumPX_CL-617Inspect CL-617 internal
27 Mar 2026LowPX_CL-617CL-617 DP high
01 Oct 2025LowPX_CL-617CL-617 DP high
04 Jul 2025MediumPX_CL-617CL-617 DP high

Recent goods issues

Never issued in the 17-month history.