SCREEN,WIRE,SIZE JG151,PTFE
Material 4100105361 · SCREEN · Plant 1000
BReorderNormalBelow reorder point
- Material
- 4100105361
- Category
- SCREEN
- Base unit
- SHT
- MRP type
- Stock Item
- Criticality
- B (2 of 3 FuncLocs A/B)
- Supplier
- BERKAH ENERGI MAKMUR PT
- Lead time
- 40 d · P80 65 d
- Unit price
- Rp 458,264
Recommendation
- 1.Forecast 1.1 SHT/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~40 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SHT
Rp 916,528 · order by 01 Oct 2026
Expected arrival ≈ 40 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 458,264
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 158 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 124.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-1291 C4 PRODUCT DRUM | B | 1 | 0 | 0.08 |
| PX_VD-255 GASOLINE KO DRUM | B | 1 | 0 | 0.08 |
| PX_CL-101 ETHYLENE COLUMN | S | 1 | 2 | 0.81 |
Lead time and procurement
Lead time 40 ± 28 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Jan 2026 | PR03 Regular replenishment | 1 | Rp 455,548 | 19 Feb 2026 | 29 d |
| 13 Oct 2025 | PR06 Regular replenishment | 1 | Rp 460,980 | 09 Nov 2025 | 27 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Apr 2026 | Medium | PX_CL-101 | Leak from packing |
| 11 May 2025 | Medium | PX_CL-101 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Apr 2026 | 1 | 201000026103 | Corrective |
| 31 Aug 2025 | 1 | 201000033571 | Corrective |
| 30 Aug 2025 | 1 | 201000011001 | Corrective |