Sparely
DU

SCREEN,WIRE,SIZE JG151,PTFE

Material 4100105361 · SCREEN · Plant 1000

BReorderNormalBelow reorder point
Material
4100105361
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
B (2 of 3 FuncLocs A/B)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
40 d · P80 65 d
Unit price
Rp 458,264

Recommendation

  • 1.Forecast 1.1 SHT/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~40 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SHT
Rp 916,528 · order by 01 Oct 2026
Expected arrival ≈ 40 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 458,264
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 158 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 124.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-1291
C4 PRODUCT DRUM
B100.08
PX_VD-255
GASOLINE KO DRUM
B100.08
PX_CL-101
ETHYLENE COLUMN
S120.81

Lead time and procurement

Lead time 40 ± 28 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
21 Jan 2026PR03
Regular replenishment
1Rp 455,54819 Feb 202629 d
13 Oct 2025PR06
Regular replenishment
1Rp 460,98009 Nov 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Apr 2026MediumPX_CL-101Leak from packing
11 May 2025MediumPX_CL-101Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
26 Apr 20261201000026103Corrective
31 Aug 20251201000033571Corrective
30 Aug 20251201000011001Corrective