SCREEN,WIRE,TYPE MI253,SS316
Material 4100105397 · SCREEN · Plant 1000
AMaintainCritical insurance spare
- Material
- 4100105397
- Category
- SCREEN
- Base unit
- SHT
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 48 d · P80 65 d
- Unit price
- Rp 421,534 (est.)
Recommendation
- 1.Forecast 0.1 SHT/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~48 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 421,534
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 29.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1686 ETHYLENE SCRUBBER | A | 1 | 3 | 0.81 |
| PX_CL-1475 C3 RECYCLE STRIPPER | A | 1 | 2 | 0.81 |
Lead time and procurement
Lead time 48 ± 28 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Sept 2026 | Medium | PX_CL-1686 | Repair insulation CL-1686 |
| 03 Sept 2026 | Medium | PX_CL-1686 | Install scaffolding at CL-1686 |
| 30 Aug 2026 | Emergency | PX_CL-1475 | Replace lamp as per PM finding |
| 12 May 2025 | Low | PX_CL-1686 | Inspect CL-1686 internal |
| 04 May 2025 | Low | PX_CL-1475 | Install scaffolding at CL-1475 |
Recent goods issues
Never issued in the 17-month history.