SCREEN,WIRE,MODEL KG616,A105

Material 4100105787 · SCREEN · Plant 1000

BReduceNon-moving
Material
4100105787
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
48 d · P80 65 d
Unit price
Rp 421,534 (est.)

Recommendation

  • 1.Forecast 0.0 SHT/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~48 days; expected demand during lead time 0.0.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 5 exceeds the level to keep (2) by 3.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.6%
stockout risk now 0%
Unit price
Rp 421,534
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-348
SEAL OIL TOWER
B130.81

Lead time and procurement

Lead time 48 ± 28 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026LowPX_CL-348Leak from packing
15 Mar 2026LowPX_CL-348Install scaffolding at CL-348
22 May 2025MediumPX_CL-348PSM25/[MSI-B-25-GCX-389] Permanent repai

Recent goods issues

Never issued in the 17-month history.