SCREEN,WIRE,MODEL WL210,CS

Material 4100106097 · SCREEN · Plant 1000

AReorderCriticalStockout
Material
4100106097
Category
SCREEN
Base unit
SHT
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
SURYA INSTRUMEN MAKMUR PT
Lead time
49 d · P80 65 d
Unit price
Rp 384,804

Recommendation

  • 1.Forecast 1.0 SHT/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~49 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SHT
Rp 1.2M · order by 01 Oct 2026
Expected arrival ≈ 49 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 13%
Unit price
Rp 384,804
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 180 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 437.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-617
QUENCH OIL COLUMN
A152.52

Lead time and procurement

Lead time 49 ± 28 days (PO history + category, 2 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
15 Dec 2025PR03
Regular replenishment
1Rp 391,68311 Jan 202627 d
06 Aug 2025PR05
Project / turnaround
2Rp 377,92421 Oct 202576 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_CL-617Inspect CL-617 internal
05 Aug 2026MediumPX_CL-617Inspect CL-617 internal
27 Mar 2026LowPX_CL-617CL-617 DP high
01 Oct 2025LowPX_CL-617CL-617 DP high
04 Jul 2025MediumPX_CL-617CL-617 DP high

Recent goods issues

Posting dateQtyOrderOrder type
04 Apr 20261201000013794Corrective