SCREEN,WIRE,MODEL WL210,CS
Material 4100106097 · SCREEN · Plant 1000
AReorderCriticalStockout
- Material
- 4100106097
- Category
- SCREEN
- Base unit
- SHT
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- SURYA INSTRUMEN MAKMUR PT
- Lead time
- 49 d · P80 65 d
- Unit price
- Rp 384,804
Recommendation
- 1.Forecast 1.0 SHT/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~49 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SHT
Rp 1.2M · order by 01 Oct 2026
Expected arrival ≈ 49 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 13%
Unit price
Rp 384,804
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 180 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 437.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-617 QUENCH OIL COLUMN | A | 1 | 5 | 2.52 |
Lead time and procurement
Lead time 49 ± 28 days (PO history + category, 2 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Dec 2025 | PR03 Regular replenishment | 1 | Rp 391,683 | 11 Jan 2026 | 27 d |
| 06 Aug 2025 | PR05 Project / turnaround | 2 | Rp 377,924 | 21 Oct 2025 | 76 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Sept 2026 | Low | PX_CL-617 | Inspect CL-617 internal |
| 05 Aug 2026 | Medium | PX_CL-617 | Inspect CL-617 internal |
| 27 Mar 2026 | Low | PX_CL-617 | CL-617 DP high |
| 01 Oct 2025 | Low | PX_CL-617 | CL-617 DP high |
| 04 Jul 2025 | Medium | PX_CL-617 | CL-617 DP high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Apr 2026 | 1 | 201000013794 | Corrective |