SCREEN,WIRE,MODEL UZ71,VITON

Material 4100106632 · SCREEN · Plant 1000

AReduceNon-moving
Material
4100106632
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
53 d · P80 65 d
Unit price
Rp 203,338

Recommendation

  • 1.Forecast 0.0 SHT/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~53 days; expected demand during lead time 0.0.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 4 exceeds the level to keep (2) by 2.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.5%
stockout risk now 0%
Unit price
Rp 203,338
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 14.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-1475
C3 RECYCLE STRIPPER
A120.81

Lead time and procurement

Lead time 53 ± 28 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
19 Jun 2026PR03
Regular replenishment
2Rp 197,58615 Aug 202657 d
06 Dec 2025PR05
Project / turnaround
1Rp 209,08906 Feb 202662 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Aug 2026EmergencyPX_CL-1475Replace lamp as per PM finding
04 May 2025LowPX_CL-1475Install scaffolding at CL-1475

Recent goods issues

Never issued in the 17-month history.