SCREEN,WIRE,MODEL UZ71,VITON
Material 4100106632 · SCREEN · Plant 1000
AReduceNon-moving
- Material
- 4100106632
- Category
- SCREEN
- Base unit
- SHT
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 53 d · P80 65 d
- Unit price
- Rp 203,338
Recommendation
- 1.Forecast 0.0 SHT/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~53 days; expected demand during lead time 0.0.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.5%
stockout risk now 0%
Unit price
Rp 203,338
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 14.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1475 C3 RECYCLE STRIPPER | A | 1 | 2 | 0.81 |
Lead time and procurement
Lead time 53 ± 28 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Jun 2026 | PR03 Regular replenishment | 2 | Rp 197,586 | 15 Aug 2026 | 57 d |
| 06 Dec 2025 | PR05 Project / turnaround | 1 | Rp 209,089 | 06 Feb 2026 | 62 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Aug 2026 | Emergency | PX_CL-1475 | Replace lamp as per PM finding |
| 04 May 2025 | Low | PX_CL-1475 | Install scaffolding at CL-1475 |
Recent goods issues
Never issued in the 17-month history.