SCREEN,WIRE,TYPE VY33,NBR

Material 4100106687 · SCREEN · Plant 1000

AReduceExcess
Material
4100106687
Category
SCREEN
Base unit
SHT
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
SURYA PERKASA GLOBAL PT
Lead time
47 d · P80 65 d
Unit price
Rp 214,185

Recommendation

  • 1.Forecast 2.8 SHT/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.Stock 17 exceeds the level to keep (7) by 10.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
17 / 0
no open PO
Today Min / Max
3 / 9
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 214,185
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 608.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-408
SPENT CAUSTIC SEPARATOR
A151.79

Lead time and procurement

Lead time 47 ± 28 days (PO history + category, 1 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
23 Apr 2026PR06
Regular replenishment
2Rp 214,18504 Jun 202642 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026LowPX_VD-408Leak from packing
19 Aug 2026LowPX_VD-408Install scaffolding at VD-408
15 Jun 2026MediumPX_VD-408Replace lamp as per PM finding
19 May 2026MediumPX_VD-408VD-408 level glass broken
12 Aug 2025MediumPX_VD-408Inspect VD-408

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20262201000001687Corrective
30 Sept 20261201000001687Corrective
10 Sept 20251201000024365Corrective