OIL,LUBRICANT,ISO VG 220,SYNTHETIC,209L
Material 4100107016 · OIL · Plant 1000
AMonitorHealthy
- Material
- 4100107016
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (9 of 11 FuncLocs A/B)
- Supplier
- CAHAYA ELEKTRIK JAYA PT
- Lead time
- 39 d · P80 55 d
- Unit price
- Rp 92,897
Recommendation
- 1.Forecast 364 L/year: 358 unplanned (recency-weighted compound poisson (own history)) + 5.7 from the maintenance plan.
- 2.Lead time ~39 days; expected demand during lead time 39 (incl. 0.7 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 137, order up to 380.
- 4.Installed on 11 FuncLoc(s), 9 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 265Single sourceAbnormal consumptionOpen POPlanned demand in lead timeSame description as 1 other material number
On hand / on order
261 / 519
next delivery 21 Oct 2026
Today Min / Max
70 / 139
static parameters in BoM
Rec. Min (reorder point)
137
safety stock 99
Rec. Max
380
order qty 243
Service level
99.9%
stockout risk now 0%
Unit price
Rp 92,897
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 17 issue days in the last 180 days, last issue 2 days ago, 3 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 5 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (285 units) excluded from the baseline.
Demand pattern Erratic · 41 issue days · 7 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 11 functional locations
9 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-854C FEED FAN | A | 1 | 7 | 2.28 |
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_PP-1909A QUENCH WATER PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1224A CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PY_PP-1063 METHANE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-473A CONDENSATE PUMP | B | 1 | 6 | 1.47 |
| PX_PP-1168A SEAL OIL PUMP | B | 1 | 0 | 0.19 |
| PX_PP-311C REFLUX PUMP | B | 1 | 0 | 0.19 |
| PY_PP-1584B COOLING WATER PUMP | B | 1 | 0 | 0.19 |
| PY_PP-315A HYDROGEN PUMP | C | 1 | 5 | 1.90 |
| PX_KC-210D ETHYLENE BLOWER | S | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 39 ± 17 days (PO history, 14 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Sept 2026 | PR03 Regular replenishment | 519 | Rp 95,092 | 21 Oct 2026 open | 43 d |
| 14 Jul 2026 | PR06 Regular replenishment | 551 | Rp 92,784 | 12 Sept 2026 | 60 d |
| 21 May 2026 | PR03 Regular replenishment | 573 | Rp 92,290 | 05 Jun 2026 | 15 d |
| 10 May 2026 | PR03 Regular replenishment | 437 | Rp 93,009 | 27 Jun 2026 | 48 d |
| 06 May 2026 | PR03 Regular replenishment | 354 | Rp 89,431 | 10 Jun 2026 | 35 d |
| 16 Mar 2026 | PR03 Regular replenishment | 558 | Rp 95,513 | 18 Apr 2026 | 33 d |
| 05 Mar 2026 | PR03 Regular replenishment | 441 | Rp 88,838 | 18 May 2026 | 74 d |
| 02 Nov 2025 | PR06 Regular replenishment | 478 | Rp 95,951 | 01 Dec 2025 | 29 d |
| 29 Oct 2025 | PR04 Regular (other) | 602 | Rp 90,330 | 15 Dec 2025 | 47 d |
| 18 Oct 2025 | PR05 Project / turnaround | 804 | Rp 94,441 | 25 Dec 2025 | 68 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PY_PP-1063 | Lube oil change | 0.72 |
| 14 Dec 2026 | PY_PP-1584B | Lube oil change | 0.72 |
| 31 Dec 2026 | PY_PP-1063 | Lube oil change | 0.72 |
| 15 Mar 2027 | PY_PP-1584B | Lube oil change | 0.72 |
| 02 Apr 2027 | PY_PP-1063 | Lube oil change | 0.72 |
| 15 Jun 2027 | PY_PP-1584B | Lube oil change | 0.72 |
| 02 Jul 2027 | PY_PP-1063 | Lube oil change | 0.72 |
| 14 Sept 2027 | PY_PP-1584B | Lube oil change | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 22 Sept 2026 | Medium | PX_KC-854C | Overhaul |
| 12 Sept 2026 | Medium | PX_PP-473A | Painting PP-473A |
| 03 Aug 2026 | Medium | PY_PP-315A | [MSI-B-26-CTF-281] Permanent repair |
| 29 Jul 2026 | Medium | PX_KC-854C | Install scaffolding at KC-854C |
| 17 Jul 2026 | Low | PX_KC-854C | Painting KC-854C |
| 28 May 2026 | Medium | PY_PP-315A | Leak from packing |
| 17 May 2026 | Low | PX_KC-396 | Overhaul |
| 13 Mar 2026 | Medium | PX_KC-854C | KC-854C bearing temp high |
| 12 Feb 2026 | Medium | PX_PP-473A | PP-473A abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Sept 2026 | 1 | 201000013476 | Corrective |
| 27 Sept 2026 | 1 | 209000029477 | Other maintenance |
| 14 Sept 2026 | 4 | 209000036917 | Other maintenance |
| 03 Sept 2026 | 4 | 205000021758 | Other maintenance |
| 26 Aug 2026 | 20 | 201000011526 | Corrective |
| 13 Aug 2026 | 5 | 201000039930 | Corrective |
| 11 Aug 2026 | 5 | 201000020990 | Corrective |
| 30 Jul 2026 | 20 | 201000033262 | Corrective |
| 15 Jul 2026 | 5 | 201000011801 | Corrective |
| 05 Jun 2026 | 5 | 201000025517 | Corrective |
| 27 May 2026 | 20 | 201000029008 | Corrective |
| 21 May 2026 | 4 | 201000022307 | Corrective |
| 18 May 2026 | 4 | 204000026366 | Preventive |
| 04 May 2026 | 5 | 201000008566 | Corrective |
| 26 Apr 2026 | 1 | 201000020232 | Corrective |