OIL,LUBRICANT,ISO VG 220,SYNTHETIC,209L

Material 4100107016 · OIL · Plant 1000

AMonitorHealthy
Material
4100107016
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (9 of 11 FuncLocs A/B)
Supplier
CAHAYA ELEKTRIK JAYA PT
Lead time
39 d · P80 55 d
Unit price
Rp 92,897

Recommendation

  • 1.Forecast 364 L/year: 358 unplanned (recency-weighted compound poisson (own history)) + 5.7 from the maintenance plan.
  • 2.Lead time ~39 days; expected demand during lead time 39 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 137, order up to 380.
  • 4.Installed on 11 FuncLoc(s), 9 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 265Single sourceAbnormal consumptionOpen POPlanned demand in lead timeSame description as 1 other material number
On hand / on order
261 / 519
next delivery 21 Oct 2026
Today Min / Max
70 / 139
static parameters in BoM
Rec. Min (reorder point)
137
safety stock 99
Rec. Max
380
order qty 243
Service level
99.9%
stockout risk now 0%
Unit price
Rp 92,897
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 17 issue days in the last 180 days, last issue 2 days ago, 3 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (285 units) excluded from the baseline.

Demand pattern Erratic · 41 issue days · 7 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 11 functional locations

9 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-854C
FEED FAN
A172.28
PX_KC-396
WASH WATER BLOWER
A131.43
PX_PP-1909A
QUENCH WATER PUMP
A110.19
PX_PP-1224A
CAUSTIC PUMP
A100.19
PY_PP-1063
METHANE PUMP
A100.19
PX_PP-473A
CONDENSATE PUMP
B161.47
PX_PP-1168A
SEAL OIL PUMP
B100.19
PX_PP-311C
REFLUX PUMP
B100.19
PY_PP-1584B
COOLING WATER PUMP
B100.19
PY_PP-315A
HYDROGEN PUMP
C151.90
PX_KC-210D
ETHYLENE BLOWER
S100.57

Lead time and procurement

Lead time 39 ± 17 days (PO history, 14 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
08 Sept 2026PR03
Regular replenishment
519Rp 95,09221 Oct 2026
open
43 d
14 Jul 2026PR06
Regular replenishment
551Rp 92,78412 Sept 202660 d
21 May 2026PR03
Regular replenishment
573Rp 92,29005 Jun 202615 d
10 May 2026PR03
Regular replenishment
437Rp 93,00927 Jun 202648 d
06 May 2026PR03
Regular replenishment
354Rp 89,43110 Jun 202635 d
16 Mar 2026PR03
Regular replenishment
558Rp 95,51318 Apr 202633 d
05 Mar 2026PR03
Regular replenishment
441Rp 88,83818 May 202674 d
02 Nov 2025PR06
Regular replenishment
478Rp 95,95101 Dec 202529 d
29 Oct 2025PR04
Regular (other)
602Rp 90,33015 Dec 202547 d
18 Oct 2025PR05
Project / turnaround
804Rp 94,44125 Dec 202568 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PY_PP-1063Lube oil change0.72
14 Dec 2026PY_PP-1584BLube oil change0.72
31 Dec 2026PY_PP-1063Lube oil change0.72
15 Mar 2027PY_PP-1584BLube oil change0.72
02 Apr 2027PY_PP-1063Lube oil change0.72
15 Jun 2027PY_PP-1584BLube oil change0.72
02 Jul 2027PY_PP-1063Lube oil change0.72
14 Sept 2027PY_PP-1584BLube oil change0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_KC-396Replace lamp as per PM finding
22 Sept 2026MediumPX_KC-854COverhaul
12 Sept 2026MediumPX_PP-473APainting PP-473A
03 Aug 2026MediumPY_PP-315A[MSI-B-26-CTF-281] Permanent repair
29 Jul 2026MediumPX_KC-854CInstall scaffolding at KC-854C
17 Jul 2026LowPX_KC-854CPainting KC-854C
28 May 2026MediumPY_PP-315ALeak from packing
17 May 2026LowPX_KC-396Overhaul
13 Mar 2026MediumPX_KC-854CKC-854C bearing temp high
12 Feb 2026MediumPX_PP-473APP-473A abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
29 Sept 20261201000013476Corrective
27 Sept 20261209000029477Other maintenance
14 Sept 20264209000036917Other maintenance
03 Sept 20264205000021758Other maintenance
26 Aug 202620201000011526Corrective
13 Aug 20265201000039930Corrective
11 Aug 20265201000020990Corrective
30 Jul 202620201000033262Corrective
15 Jul 20265201000011801Corrective
05 Jun 20265201000025517Corrective
27 May 202620201000029008Corrective
21 May 20264201000022307Corrective
18 May 20264204000026366Preventive
04 May 20265201000008566Corrective
26 Apr 20261201000020232Corrective