OIL,LUBRICANT,ISO VG 220,MINERAL,5L
Material 4100107169 · OIL · Plant 1000
AMonitorHealthy
- Material
- 4100107169
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 23 d · P80 27 d
- Unit price
- Rp 53,793
Recommendation
- 1.Forecast 130 L/year: 127 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
- 2.Lead time ~23 days; expected demand during lead time 8.9 (incl. 0.7 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 46, order up to 176.
- 4.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 86% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single sourceAbnormal consumptionPlanned demand in lead time
On hand / on order
70 / 0
no open PO
Today Min / Max
48 / 75
static parameters in BoM
Rec. Min (reorder point)
46
safety stock 38
Rec. Max
176
order qty 130
Service level
99.9%
stockout risk now 0%
Unit price
Rp 53,793
PO history
ML early warning: 86% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 6 days ago, 6 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (204 units) excluded from the baseline.
Demand pattern Erratic · 19 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1735 SPENT CAUSTIC PUMP | A | 1 | 4 | 1.47 |
| PX_PP-1320D INHIBITOR PUMP | B | 1 | 11 | 4.47 |
| PX_KC-513 WASH WATER BLOWER | S | 1 | 10 | 4.42 |
Lead time and procurement
Lead time 23 ± 14 days (PO history, 5 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Apr 2026 | PR03 Regular replenishment | 352 | Rp 52,919 | 16 May 2026 | 18 d |
| 28 Mar 2026 | PR06 Regular replenishment | 147 | Rp 52,662 | 04 Apr 2026 | 7 d |
| 22 Oct 2025 | PR03 Regular replenishment | 138 | Rp 56,513 | 08 Dec 2025 | 47 d |
| 07 Jul 2025 | PR06 Regular replenishment | 132 | Rp 55,244 | 29 Jul 2025 | 22 d |
| 04 May 2025 | PR03 Regular replenishment | 135 | Rp 53,793 | 25 May 2025 | 21 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 05 Oct 2026 | PX_PP-1735 | Lube oil change | 0.72 |
| 04 Feb 2027 | PX_PP-1735 | Lube oil change | 0.72 |
| 06 Jun 2027 | PX_PP-1735 | Lube oil change | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Medium | PX_KC-513 | KC-513 high vibration |
| 07 Sept 2026 | Medium | PX_KC-513 | Inspect coupling KC-513 |
| 05 Sept 2026 | Low | PX_KC-513 | Inspect coupling KC-513 |
| 30 Aug 2026 | Medium | PX_KC-513 | KC-513 high vibration |
| 12 Jul 2026 | Medium | PX_KC-513 | Inspect coupling KC-513 |
| 07 Jul 2026 | Medium | PX_PP-1320D | PP-1320D seal leak |
| 20 Jun 2026 | Medium | PX_KC-513 | KC-513 bearing temp high |
| 11 May 2026 | Medium | PX_KC-513 | Leak from packing |
| 26 Apr 2026 | Low | PX_PP-1320D | PP-1320D abnormal noise |
| 07 Apr 2026 | Medium | PX_PP-1320D | PP-1320D seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Sept 2026 | 20 | 209000029477 | Other maintenance |
| 12 Jul 2026 | 5 | 209000016630 | Other maintenance |
| 11 Jun 2026 | 4 | 201000006025 | Corrective |
| 03 Jun 2026 | 200 | 203000002440 | Turnaround |
| 01 May 2026 | 20 | 201000025318 | Corrective |
| 17 Apr 2026 | 4 | 201000014761 | Corrective |
| 31 Mar 2026 | 1 | 201000026277 | Corrective |
| 16 Jan 2026 | 200 | 201000023201 | Corrective |
| 04 Jan 2026 | 1 | 201000027489 | Corrective |
| 29 Dec 2025 | 5 | 201000008587 | Corrective |
| 16 Dec 2025 | 20 | 201000022685 | Corrective |
| 04 Dec 2025 | 1 | 201000025177 | Corrective |
| 30 Nov 2025 | 200 | 209000037038 | Other maintenance |
| 26 Nov 2025 | 20 | 201000023941 | Corrective |
| 23 Nov 2025 | 4 | 203000038363 | Turnaround |