OIL,LUBRICANT,ISO VG 32,SYNTHETIC,5L
Material 4100107173 · OIL · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100107173
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 26 d · P80 35 d
- Unit price
- Rp 235,998
Recommendation
- 1.Forecast 92 L/year: 92 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~26 days; expected demand during lead time 6.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 117.
- 4.On hand 29 + on order 0 is at or below the reorder point: order 88 now.
- 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
- 6.ML early warning: 79% probability of demand in the next 90 days.
Proposed purchase requisition
88 L
Rp 20.8M · order by 01 Oct 2026
Expected arrival ≈ 26 days
ML early warningLast turnaround used 201Single sourceAbnormal consumption
On hand / on order
29 / 0
no open PO
Today Min / Max
37 / 55
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 34
Rec. Max
117
order qty 77
Service level
99.9%
stockout risk now 3%
Unit price
Rp 235,998
PO history
ML early warning: 79% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 36 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (201 units) excluded from the baseline.
Demand pattern Lumpy · 17 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-250D PROPYLENE FAN | A | 1 | 0 | 0.57 |
| PX_PP-490A REFLUX PUMP | B | 1 | 1 | 0.19 |
| PX_KC-365C INHIBITOR BLOWER | S | 1 | 7 | 3.14 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 26 ± 12 days (PO history, 10 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Aug 2026 | PR06 Regular replenishment | 211 | Rp 235,823 | 06 Sept 2026 | 23 d |
| 13 Aug 2026 | PR03 Regular replenishment | 119 | Rp 241,012 | 24 Aug 2026 | 11 d |
| 11 Aug 2026 | PR03 Regular replenishment | 109 | Rp 232,862 | 27 Aug 2026 | 16 d |
| 20 Jul 2026 | PR05 Project / turnaround | 150 | Rp 242,973 | 05 Sept 2026 | 47 d |
| 12 Mar 2026 | PR03 Regular replenishment | 111 | Rp 236,173 | 25 Mar 2026 | 13 d |
| 09 Mar 2026 | PR03 Regular replenishment | 123 | Rp 231,291 | 18 Apr 2026 | 40 d |
| 26 Feb 2026 | PR03 Regular replenishment | 186 | Rp 241,008 | 27 Mar 2026 | 29 d |
| 20 Feb 2026 | PR03 Regular replenishment | 101 | Rp 232,817 | 18 Mar 2026 | 26 d |
| 04 Nov 2025 | PR03 Regular replenishment | 81 | Rp 237,880 | 28 Nov 2025 | 24 d |
| 11 Aug 2025 | PR06 Regular replenishment | 243 | Rp 228,248 | 14 Sept 2025 | 34 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-365C | KC-365C lube oil filter DP high |
| 26 Jul 2026 | Medium | PX_KC-365C | Inspect coupling KC-365C |
| 21 Nov 2025 | Medium | PX_KC-150A | KC-150A bearing temp high |
| 18 Nov 2025 | Medium | PX_KC-365C | Install scaffolding at KC-365C |
| 01 Nov 2025 | Medium | PX_KC-365C | KC-365C bearing temp high |
| 26 Oct 2025 | Low | PX_KC-365C | Leak from packing |
| 16 Sept 2025 | Medium | PX_KC-365C | KC-365C lube oil filter DP high |
| 19 Jul 2025 | Medium | PX_KC-365C | Repair insulation KC-365C |
| 30 May 2025 | Medium | PX_PP-490A | PP-490A discharge pressure low |
| 21 May 2025 | Low | PX_KC-150A | PSM25/Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Aug 2026 | 5 | 201000033360 | Corrective |
| 20 Jun 2026 | 4 | 209000014083 | Other maintenance |
| 16 Apr 2026 | 5 | 205000002255 | Other maintenance |
| 30 Mar 2026 | 5 | 201000015657 | Corrective |
| 27 Mar 2026 | 5 | 201000032373 | Corrective |
| 14 Feb 2026 | 200 | 201000032808 | Corrective |
| 12 Jan 2026 | 20 | 201000005527 | Corrective |
| 11 Jan 2026 | 20 | 201000033090 | Corrective |
| 30 Dec 2025 | 5 | 201000036306 | Corrective |
| 26 Dec 2025 | 200 | 203000001878 | Turnaround |
| 20 Dec 2025 | 1 | 203000033370 | Turnaround |
| 04 Dec 2025 | 4 | 201000006628 | Corrective |
| 06 Nov 2025 | 20 | 201000005082 | Corrective |
| 31 Oct 2025 | 4 | 209000022917 | Other maintenance |
| 21 Aug 2025 | 1 | 201000031456 | Corrective |