OIL,LUBRICANT,ISO VG 68,MINERAL,5L
Material 4100107224 · OIL · Plant 1000
AReduceExcess
- Material
- 4100107224
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 20 d · P80 24 d
- Unit price
- Rp 100,286
Recommendation
- 1.Forecast 34 L/year: 34 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~20 days; expected demand during lead time 1.9.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 49.
- 4.Stock 852 exceeds the level to keep (205) by 647; the level includes the 205 used in the last turnaround.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
- 6.ML early warning: 66% probability of demand in the next 90 days.
ML early warningLast turnaround used 205Single sourceAbnormal consumptionSame description as 1 other material number
On hand / on order
852 / 0
no open PO
Today Min / Max
14 / 26
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 14
Rec. Max
49
order qty 34
Service level
99.9%
stockout risk now 0%
Unit price
Rp 100,286
PO history
ML early warning: 66% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 9 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (205 units) excluded from the baseline.
Demand pattern Lumpy · 11 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 5 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-426D RICH AMINE BLOWER | A | 1 | 0 | 0.57 |
| PX_PP-1363 CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-596A C4 PRODUCT PUMP | B | 1 | 3 | 1.05 |
| PX_KC-830D FLUSHING OIL BLOWER | S | 1 | 4 | 1.85 |
| PX_KC-486 CONDENSATE AIR COMPRESSOR | S | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 20 ± 10 days (PO history, 11 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Jul 2026 | PR03 Regular replenishment | 121 | Rp 100,286 | 21 Jul 2026 | 9 d |
| 18 May 2026 | PR06 Regular replenishment | 96 | Rp 100,641 | 27 Jun 2026 | 40 d |
| 29 Jan 2026 | PR03 Regular replenishment | 196 | Rp 99,190 | 19 Feb 2026 | 21 d |
| 14 Jan 2026 | PR03 Regular replenishment | 184 | Rp 103,418 | 27 Jan 2026 | 13 d |
| 21 Dec 2025 | PR06 Regular replenishment | 162 | Rp 100,263 | 08 Jan 2026 | 18 d |
| 30 Sept 2025 | PR03 Regular replenishment | 159 | Rp 99,499 | 10 Oct 2025 | 10 d |
| 23 Sept 2025 | PR03 Regular replenishment | 208 | Rp 100,503 | 17 Oct 2025 | 24 d |
| 26 Aug 2025 | PR03 Regular replenishment | 196 | Rp 97,405 | 18 Sept 2025 | 23 d |
| 08 Aug 2025 | PR03 Regular replenishment | 201 | Rp 103,532 | 03 Sept 2025 | 26 d |
| 02 Aug 2025 | PR03 Regular replenishment | 203 | Rp 98,316 | 24 Aug 2025 | 22 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 31 May 2026 | Low | PX_KC-830D | KC-830D high vibration |
| 06 Mar 2026 | Medium | PX_KC-830D | Install scaffolding at KC-830D |
| 05 Mar 2026 | Low | PX_PP-596A | Oil leak at PP-596A bearing housing |
| 28 Nov 2025 | Medium | PX_KC-830D | KC-830D bearing temp high |
| 10 Oct 2025 | Low | PX_PP-596A | PP-596A abnormal noise |
| 25 Aug 2025 | Low | PX_KC-830D | KC-830D high vibration |
| 20 May 2025 | Medium | PX_PP-596A | PP-596A discharge pressure low |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Sept 2026 | 20 | 201000022167 | Corrective |
| 25 Aug 2026 | 5 | 201000024850 | Corrective |
| 21 Apr 2026 | 4 | 209000024091 | Other maintenance |
| 30 Mar 2026 | 4 | 201000012345 | Corrective |
| 23 Jan 2026 | 4 | 201000035525 | Corrective |
| 13 Jan 2026 | 200 | 201000004976 | Corrective |
| 07 Jan 2026 | 1 | 201000023699 | Corrective |
| 05 Jan 2026 | 1 | 201000025317 | Corrective |
| 03 Jan 2026 | 5 | 201000008720 | Corrective |
| 26 Dec 2025 | 5 | 203000006078 | Turnaround |
| 16 Dec 2025 | 200 | 203000037460 | Turnaround |
| 14 Jul 2025 | 4 | 209000000281 | Other maintenance |
| 22 Jun 2025 | 5 | 201000032173 | Corrective |