OIL,LUBRICANT,ISO VG 150,MINERAL,20L
Material 4100107255 · OIL · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100107255
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 36 d
- Unit price
- Rp 157,448 (est.)
Recommendation
- 1.Forecast 2.2 L/year: 2.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~24 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 1%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 55.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-801 DEMIN WATER FAN | A | 1 | 2 | 1.43 |
| PX_KC-620A DEMIN WATER AIR COMPRESSOR | B | 1 | 2 | 1.00 |
| PX_KC-891A HYDROGEN FAN | S | 1 | 5 | 1.85 |
| PX_KC-216B LEAN AMINE FAN | S | 1 | 1 | 0.57 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Sept 2026 | Medium | PX_KC-891A | KC-891A high vibration |
| 12 Apr 2026 | Emergency | PX_KC-801 | KC-801 high vibration |
| 20 Feb 2026 | Medium | PX_KC-891A | [MSI-B-26-RKP-241/M] Replace line |
| 15 Dec 2025 | Medium | PX_KC-620A | Inspect coupling KC-620A |
| 09 Nov 2025 | Low | PX_KC-891A | Repair insulation KC-891A |
| 12 Sept 2025 | Medium | PX_KC-891A | Install scaffolding at KC-891A |
| 12 Jul 2025 | Low | PX_KC-801 | KC-801 bearing temp high |
| 15 May 2025 | Medium | PX_KC-216B | KC-216B high vibration |
| 09 May 2025 | Medium | PX_KC-891A | KC-891A bearing temp high |
| 08 May 2025 | Medium | PX_KC-620A | Install scaffolding at KC-620A |
Recent goods issues
Never issued in the 17-month history.